Construction joints are stopping places in the process of placing concrete, and they are required because in many structures it is impractical to place concrete in one continuous operation. The amount of concrete that can be placed at one time is governed by the batching and mixing capacity and by the strength of the formwork. A good construction joint should provide adequate flexural and shear continuity through the interface.
In this study, the effect of location of construction joints on the performance of reinforced concrete structural elements is experimentally investigated.
Nineteen beam specimens with dimensions of 200×200×950 mm were tested. The variables investigated are the location of the construction joints
... Show MoreThis research aims to explore the impact of strategic intelligence by his dimensions (Foresight , system thinking, vision, motivation and partnership) on decision making styles which represented by ( rational, intuitive, dependent, Spontaneous and Avoidant style) for a sample of the administrative leaders in the center of Reconstruction &Housing Ministry and Some its formations which are companies of (Sa'ad, Al Mansour, al Farouq, Assyria, al-Mu'tasim, al- Rasheed, and Public Authority for Housing). So to achieve the research objectives and to test hypotheses, it has been relying
... Show MoreSuffer most of the facilities of the high cost of inventory , which affects the high cost of the product and thus affects many administrative decisions , as well as suffer the facilities of the systems developed by the provisions of inventory control , and this problem is exacerbated in the construction sector where the inventory in the form of Construction spin of the Year for another it becomes difficult to control the cost effectively , and is the research problem in question follows: What are the implications of the use of the system in time inventory accounting system for the contracting company does kills Alrkaah to the provisions of the cost of inventory and what is the optimal approach to inventory control ? Find assumed
... Show MoreThe main aim of this research is to introduce financing cost optimization and different financing alternatives. There are many studies about financing cost optimization. All previous studies considering the cost of financing have many shortcomings, some considered only one source of financing as a credit line without taking into account different financing alternatives. Having only one funding alternative powers, restricts contractors and leads to a very specific financing model. Although it is beneficial for the contractor to use a long-term loan to minimize interest charges and prevent a substantial withdrawal from his credit line, none of the existing financial-based planning models have considered long-term loans in
... Show MoreConstruction projects are characterized as projects with multi phases and activities, complex, unique, and have many different parties and stakeholders. Risks could appear at one or more of the construction project stages and may affect the achievement of project objectives. Therefore, one of the key elements in the planning phase of any project is the risk management process (RMP). This study attempts to understand the terminology of risk in general, risk management, and response to risk in particular. This study is mainly a review of thirty-eight studies that have been published between 1997 and 2020 that demonstrate the importance of the crucial phase of risk response from the risk management process and its impact on