Knowledge of the distribution of the rock mechanical properties along the depth of the wells is an important task for many applications related to reservoir geomechanics. Such these applications are wellbore stability analysis, hydraulic fracturing, reservoir compaction and subsidence, sand production, and fault reactivation. A major challenge with determining the rock mechanical properties is that they are not directly measured at the wellbore. They can be only sampled at well location using rock testing. Furthermore, the core analysis provides discrete data measurements for specific depth as well as it is often available only for a few wells in a field of interest. This study presents a methodology to generate synthetic-geomechanical well logs for the production section of the Buzurgan oil field, located in the south of Iraq, using an artificial neural network. An issue with the area of study is that shear wave velocities and pore pressure measurements in some wells are missing or incomplete possibly for cost and time-saving purposes. The unavailability of these data can potentially create inaccuracies in reservoir characterization n and production management. To overcome these challenges, this study presents two developed models for estimating the shear wave velocity and pore pressure using ANN techniques. The input parameters are conventional well logs including compressional wave, bulk density, and gamma-ray. Also, this study presents a construction of 1-D mechanical earth model for the production section of Buzurgan oil field which can be used for optimizing the selected mud weights with less wellbore problems (less nonproductive time. The results showed that artificial neural network is a powerful tool in determining the shear wave velocity and formation pore pressure using conventional well logs. The constructed 1D MEM revealed a high matching between the predicted wellbore instabilities and the actual wellbore failures that were observed by the caliper log. The majority of borehole enlargements can be attributed to the formation shear failures due to an inadequate selection of mud weights while drilling. Hence, this study presents optimum mud weights (1.3 to 1.35 g/cc) that can be used to drill new wells in the Buzurgan oil field with less expected drilling problems.
Achieving an accurate and optimal rate of penetration (ROP) is critical for a cost-effective and safe drilling operation. While different techniques have been used to achieve this goal, each approach has limitations, prompting researchers to seek solutions. This study’s objective is to conduct the strategy of combining the Bourgoyne and Young (BYM) ROP equations with Bagging Tree regression in a southern Iraqi field. Although BYM equations are commonly used and widespread to estimate drilling rates, they need more specific drilling parameters to capture different ROP complexities. The Bagging Tree algorithm, a random forest variant, addresses these limitations by blending domain kno
There are many events which causes nonproductive time (NPT) in the drilling industry. The mostly effective in this NPT is pipe sticking event. A considerable amount of time and resources can be spent in efforts to free a stuck pipe. In addition, Unsuccessful fishing operations results in costly alternatives including side-tracking. The drilling in Khabaz oil field poses many operational challenges among of them stuck pipe , lost circulation, flow of salt water during drilling, and hole caving. Stuck pipe can be considered the quite difficult problem in Khabaz oil field due to associated incidents which lead to NPT activities.
Well Khabaz -34 was selected to study the problem of stuck pipe in this field. An analysis of stuck pipe event
There are many events which causes nonproductive time (NPT) in the drilling industry. The mostly effective in this NPT is pipe sticking event. A considerable amount of time and resources can be spent in efforts to free a stuck pipe. In addition, Unsuccessful fishing operations results in costly alternatives including side-tracking. The drilling in Khabaz oil field poses many operational challenges among of them stuck pipe , lost circulation, flow of salt water during drilling, and hole caving. Stuck pipe can be considered the quite difficult problem in Khabaz oil field due to associated incidents which lead to NPT activities.Well Khabaz -34 was selected to study the problem of stuck pipe in this field. An analysis of stuck pipe even
... Show MoreThree N-(hydroxylphenyl) dimethylmaleimides were directly prepared in good yields (81-86)% from the reaction of dimethylmaleic anhydride with amino phenols. The prepared imides were esterified to the corresponding benzoates, methacrylates and cinnamates via their reaction with different acid chlorides in the presence of triethylamine. The prepared esters were tested as plasticizers for PVC via preparing of thirty six samples of PVC with the prepared esters in certain weight ratio followed by recording their softening points. Comparison the results with the universal plasticizers for PVC (DOP) and (DBP) indicated that the prepared esters in general have high plasticizing efficiency.
Urban Development refers to many topics such as: increased population density, city size, and individual’s production, distribution of technology and the growth of commercial, industrial and service professions. Such development is linked to the coordination of social and cultural trends in order to achieve social progress and economical prosperity. Knowledge as a topic now is known as intellectual capital wich led to upgrae the concept of urban development to be extended into many fields of knowledge, for example, cultural, social and human development to move the level of community culture into a new better standard.
The research adopted the urban transformation based on knowledge as an important factor in gr
... Show MoreThis research aims to knowledge of the scope of applying the international specification of which is regarded to occupational health and safety management system (OHSAS 18001) second edition for year 2007 by The AL-Mammon Factory / The General Company For Vegetable Oils Industry in order to diagnosis the gap between specification requirements and reality by using the checklist made based upon the items of the specification, after translating the English copy into Arabic. The results of the research and analysis that occupational health and safety management system in comparison to the specification requirements in all of its main items, which was (%22.26) applied and documented partly, this refer to the existence of great gap (%7
... Show MoreMultilayer reservoirs are currently modeled as a single zone system by averaging the reservoir parameters associated with each reservoir zone. However, this type of modeling is rarely accurate because a single zone system does not account for the fact that each zone's pressure decreases independently. Pressure drop for each zone has an effect on the total output and would result in inter-flow and the premature depletion of one of the zones. Understanding reservoir performance requires a precise estimation of each layer's permeability and skin factor. The Multilayer Transient Analysis is a well-testing technique designed to determine formation properties in more than one layer, and its effectiveness over the past two decades has been
... Show MoreAbstract
This research aims to analyze the reality of the production process in an assembly line Cars (RUNNA) in the public company for the automotive industry / Alexandria through the use of some Lean production tools, and data were collected through permanence in the company to identify the problems of the line in order to find appropriate to adopt some Lean production tools solutions, and results showed the presence of Lead time in some stations, which is reflected on the customer's waiting time to get the car, as well as some of the problems existing in the car produced such as high temperature of the car, as the company does not take into account customer preferences,
... Show More