Preferred Language
Articles
/
EResRZEBVTCNdQwCrpS-
Estimating the cost of unclaimed electronic prescriptions at an independent pharmacy
...Show More Authors

Scopus Clarivate Crossref
View Publication
Publication Date
Sat Dec 01 2018
Journal Name
Journal Of Economics And Administrative Sciences
The impact of electronic banking transactions to increase the net revenue of the Bank of paypal in United States of America for Period ( 2010-2016 )
...Show More Authors

Abstract

   It is clear to everyone how important it is to implement transactions electronically, as it facilitates the provision of services to beneficiaries, whether individuals or institutions, to achieve many benefits that are not exclusive to the beneficiary or the applicant, but extends to the governmental and international bodies. And the number of users has reached millions since its emergence in 1995, because the concepts of electronic transactions have great advantages for the economy in general and the banking sector in particular, so cooperation in various fields with the aim of becoming an information society has become paramount, It allows customers to pay money to any company they want t

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Dec 30 2018
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Prediction of penetration Rate and cost with Artificial Neural Network for Alhafaya Oil Field
...Show More Authors

Prediction of penetration rate (ROP) is important process in optimization of drilling due to its crucial role in lowering drilling operation costs. This process has complex nature due to too many interrelated factors that affected the rate of penetration, which make difficult predicting process. This paper shows a new technique of rate of penetration prediction by using artificial neural network technique. A three layers model composed of two hidden layers and output layer has built by using drilling parameters data extracted from mud logging and wire line log for Alhalfaya oil field. These drilling parameters includes mechanical (WOB, RPM), hydraulic (HIS), and travel transit time (DT). Five data set represented five formations gathered

... Show More
View Publication Preview PDF
Crossref (5)
Crossref
Publication Date
Mon Oct 22 2018
Journal Name
Journal Of Economics And Administrative Sciences
Using Mehar method to change fuzzy cost of fuzzy linear model with practical application
...Show More Authors

  Many production companies suffers from big losses because of  high production cost and low profits for several reasons, including raw materials high prices and no taxes impose on imported goods also consumer protection law deactivation and national product and customs law, so most of consumers buy imported goods because it is characterized by modern specifications and low prices.

  The production company also suffers from uncertainty in the cost, volume of production, sales, and availability of raw materials and workers number because they vary according to the seasons of the year.

  I had adopted in this research fuzzy linear program model with fuzzy figures

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri May 01 2020
Journal Name
Environmental Technology & Innovation
Environmental remediation of synthetic leachate produced from sanitary landfills using low-cost composite sorbent
...Show More Authors

Scopus (37)
Crossref (33)
Scopus Clarivate Crossref
Publication Date
Sat Jun 29 2013
Journal Name
Wireless Personal Communications
A Low Cost Route Optimization Scheme for Cluster-Based Proxy MIPv6 Protocol
...Show More Authors

View Publication
Scopus (3)
Crossref (3)
Scopus Clarivate Crossref
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
Solving Time-Cost Tradeoff Problem with Resource Constraint Using Fuzzy Mathematical Model
...Show More Authors

Scheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Wed Mar 01 2023
Journal Name
Results In Engineering
Low-cost autonomous car level 2: Design and implementation for conventional vehicles
...Show More Authors

View Publication
Scopus (34)
Crossref (35)
Scopus Clarivate Crossref
Publication Date
Tue Feb 03 2026
Journal Name
Journal Of Mechanics Of Continua And Mathematical Sciences
XGBOOST AND COST-SENSITIVE CART FOR IMBALANCED MULTICLASS DIABETES CLASSIFICATION IN IRAQ
...Show More Authors

Diabetes imposes a substantial public health burden; according to the International Diabetes Federation, there were about 3.4 million diabetes related deaths worldwide in 2024, and in Iraq, the Federation reports that one in nine adults lives with diabetes in 2024, with 14,683 adult deaths attributable to diabetes and a total diabetes related health expenditure of 2,078 million United States dollars. The dataset analyzed in this study contains 1,000 records collected in 2020 from two Iraqi teaching hospitals and includes multiple clinical and laboratory measurements with three outcome classes, namely Non diabetic, Pre diabetic, and Diabetic, with a low prevalence of the Pre diabetic class and an imbalanced overall class distribution; the da

... Show More
Preview PDF
Publication Date
Tue Sep 01 2015
Journal Name
Journal Of Engineering
Cost of Optimum Design of Trunk Mains Network Using Geographical Information System and Support Programs
...Show More Authors

Sewer network is one of the important utilities in modern cities which discharge the sewage from all facilities. The increase of population numbers consequently leads to the increase in water consumption; hence waste water generation. Sewer networks work is very expensive and need to be designed accurately. Thus construction effective sewer network system with minimum cost is very necessary to handle waste water generation.

 In this study trunk mains networks design was applied which connect the pump stations together by underground pipes for too long distances. They usually have large diameters with varying depths which consequently need excavations and gathering from pump stations and transport the sewage

... Show More
View Publication Preview PDF
Publication Date
Fri Jan 01 2021
Journal Name
Materials Today: Proceedings
Study of some electronic and spectroscopic properties of ZnO nanostructers by density functional theory
...Show More Authors

View Publication
Scopus (8)
Crossref (7)
Scopus Clarivate Crossref