Preferred Language
Articles
/
EIaNcoYBIXToZYALd4oC
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects
...Show More Authors

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tender phase of a construction project, this study constructed the matrix of probability and impact variables and put the periods based on the risk score. Finally, this study identified a fourth main risk group and twenty-two sub-risk factors that are appropriate for the tendering phase of construction projects in Iraq

Crossref
Preview PDF
Quick Preview PDF
Publication Date
Fri Jan 01 2016
Journal Name
5th Iet International Conference On Renewable Power Generation (rpg), 2016, London, Uk
Electrical Machine Design for use in an External Combustion Free Piston Engine
...Show More Authors

Scopus (4)
Crossref (8)
Scopus Crossref
Publication Date
Sun May 01 2022
Journal Name
Journal Of Engineering
Parametric Study of a Two-Phase Closed Thermosyphon Loop
...Show More Authors

A theoretical and experimental investigation was carried out to study the behavior of a two-phase closed thermosyphon loop (TPCTL) during steady-state operation using different working fluids. Three working fluids were investigated, i.e., distilled water, methanol, and ethanol. The TPCTL was constructed from an evaporator, condenser, and two pipelines (riser and downcomer). The driving force is the difference in pressure between the evaporator and condenser sections and the fluid returns to the heating section by gravity. In this study, the significant parameters used in the experiments were filling ratios (FR%) of 50%, 75%, and 100% and heat-input range at the evaporator section of 215-860.2 W. When the loop reached to

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Jul 10 2023
Journal Name
Journal Of Engineering
Design and Implementation of Single-Phase Boost PFC Converter
...Show More Authors

In this paper, a single-phase boost type ac-dc converter with power factor correction (PFC) technique is designed and implemented. A current mode control at a constant switching frequency is used as a control strategy for PFC converter. The PFC converter is a single-stage singleswitch boost converter that uses a current shaping technique to reshape the non-sinusoidal input current drawn by the bulky capacitor in the conventional rectifier. This technique should provide an input current with almost free-harmonics, comply with the IEC61000-3-2 limits, and a system operates with near unity power factor. The other function of the boost converter that should be
accomplished is to provide a regulated DC output voltage. The complete designed

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue May 23 2023
Journal Name
Journal Of Engineering
EXPERIMENTAL AND THEORETICAL STUDY OF TWO-PHASE HEAT PIPE
...Show More Authors

In this study, thermal characteristics of a two-phase closed heat pipe were investigated experimentally and theoretically. A two-phase closed heat pipe (copper container, Fluorocarbon FC-72 (C6F14) working fluid) was fabricated to examine its performance under the effect of input heat flux range of 250–1253 W/m2 , 70% fill charge ratio and various tilt angles. The temperature distribution along the heat pipe, input heat to evaporator section, and output heat from condenser were monitored. A comprehensive mathematical model was developed to investigate the steadystate heat transfer performance of a two-phase closed heat pipe. A steady state analytical model, is presented to determine important parameters on the design of two-phase close

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Jun 20 2021
Journal Name
Bulletin Of The Iraq Natural History Museum (p-issn: 1017-8678 , E-issn: 2311-9799)
MULTIVARIATE ANALYSIS OF THE STEM ANATOMICAL CHARACTERS OF TERMINALIA L. (COMBRETACEAE) IN EGYPT
...Show More Authors

A comparative investigation of the anatomical characters through a microscopical examination of the prepared transverse sections of the stem was carried out. Six plates with 32 photomicrographs were provided to convincingly show the considerable variations of anatomical characters within the nine examined species. The matrix of 18 anatomical characters which included nine quantitative and nine qualitative was applied for the clustering analysis (CA) followed by the principal component analysis (PCA) using the Multivariate Analysis of Ecological Data, PC-ORD.
The results exhibited significant variations among the species resulting in the construction of an artificial key; this key accurately represents a sufficient tool to display the

... Show More
View Publication Preview PDF
Scopus (1)
Crossref (1)
Scopus Crossref
Publication Date
Wed Oct 01 2014
Journal Name
Engineering And Technology Journal
Investigating Forward kinematic Analysis of a 5-axes Robotic Manipulator using Denavit-Hartenberg Method and Artificial Neural Network
...Show More Authors

View Publication
Crossref
Publication Date
Tue Oct 01 2019
Journal Name
Journal Of Economics And Administrative Sciences
Scheduling projects using dynamic programming style and smart algorithm
...Show More Authors

The aim of this research is to compare traditional and modern methods to obtain the optimal solution using dynamic programming and intelligent algorithms to solve the problems of project management.

It shows the possible ways in which these problems can be addressed, drawing on a schedule of interrelated and sequential activities And clarifies the relationships between the activities to determine the beginning and end of each activity and determine the duration and cost of the total project and estimate the times used by each activity and determine the objectives sought by the project through planning, implementation and monitoring to maintain the budget assessed 

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Jan 04 2019
Journal Name
Journal Of Planner And Development
Impact of D.B.M. Best practices on Community Rehabilitation Projects
...Show More Authors

View Publication Preview PDF
Publication Date
Sat May 01 2021
Journal Name
Journal Of Engineering
Variation Orders and Their Effects of Erbil Governorate Projects
...Show More Authors

Variation order plays an important role in calculating the final cost and time. The paper aims to determine the causes of variation orders in projects performed between 2007-2014 in Erbil governorate projects. Data was collected from contract documents. Performed in the Erbil governorate projects from 2007-2014. The study seeks to identify the most significant causes of delays by assessing the common causes of delays in terms of frequency, severity and 

important indices of owners, consultants and contractors related to&n

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Tue Apr 30 2024
Journal Name
Iraqi Geological Journal
Wellbore Instability Analysis to Determine the Safe Mud Weight Window for Deep Well, Halfaya Oilfield
...Show More Authors

Wellbore instability is one of the most common issues encountered during drilling operations. This problem becomes enormous when drilling deep wells that are passing through many different formations. The purpose of this study is to evaluate wellbore failure criteria by constructing a one-dimensional mechanical earth model (1D-MEM) that will help to predict a safe mud-weight window for deep wells. An integrated log measurement has been used to compute MEM components for nine formations along the studied well. Repeated formation pressure and laboratory core testing are used to validate the calculated results. The prediction of mud weight along the nine studied formations shows that for Ahmadi, Nahr Umr, Shuaiba, and Zubair formations

... Show More
View Publication
Scopus Crossref