Preferred Language
Articles
/
DxcPZpIBVTCNdQwCjq-R
Finite Time Disturbance Observer Based on Air Conditioning System Control Scheme
...Show More Authors

A novel robust finite time disturbance observer (RFTDO) based on an independent output-finite time composite control (FTCC) scheme is proposed for an air conditioning-system temperature and humidity regulation. The variable air volume (VAV) of the system is represented by two first-order mathematical models for the temperature and humidity dynamics. In the temperature loop dynamics, a RFTDO temperature (RFTDO-T) and an FTCC temperature (FTCC-T) are designed to estimate and reject the lumped disturbances of the temperature subsystem. In the humidity loop, a robust output of the FTCC humidity (FTCC-H) and RFTDO humidity (RFTDO-H) are also designed to estimate and reject the lumped disturbances of the humidity subsystem. Based on Lyapunov theory, the stability proof of the two closed-loop controllers and observers is presented. Comparative simulations are carried out to confirm that the proposed controller outperforms conventional methods and offers greater accuracy of temperature, humidity, and carbon dioxide concentration, having superior regulation performance in terms of a rapid finite time convergence, an outstanding disturbance rejection property, and better energy consumption. In addition to presenting the comparative simulation results from the control applications on the VAV system, the quantitative values are provided to further confirm the superiority of the proposed controller. In particular, the proposed method exhibits the shortest settling time of, respectively, 15 and 40 min to reach the expected temperature and humidity, whereas other comparative controllers require a longer time to settle down.

Scopus Clarivate Crossref
View Publication
Publication Date
Mon Feb 01 2016
Journal Name
Journal Of Engineering
Valuation of Construction Projects Based on of Quantity Scale by using Expert System
...Show More Authors

The subject of an valuation of quality of construction projects is one of the topics which it becomes necessary of the absence of the quantity standards in measuring the control works and the quality valuation standards in constructional projects. In the time being it depends on the experience of the workers which leads to an apparent differences in the valuation.

The idea of this research came to put the standards to evaluate the quality of the projects in a special system depending on quantity scale nor quality specifying in order to prepare an expert system “ Crystal “ to apply this special system to able the engineers to valuate the quality of their projects easily and in more accurate ways.

View Publication Preview PDF
Publication Date
Wed Mar 18 2020
Journal Name
Baghdad Science Journal
A Software Defined Network of Video Surveillance System Based on Enhanced Routing Algorithms
...Show More Authors

Software Defined Network (SDN) is a new technology that separate the ‎control plane from the data plane. SDN provides a choice in automation and ‎programmability faster than traditional network. It supports the ‎Quality of Service (QoS) for video surveillance application. One of most ‎significant issues in video surveillance is how to find the best path for routing the packets ‎between the source (IP cameras) and destination (monitoring center). The ‎video surveillance system requires fast transmission and reliable delivery ‎and high QoS. To improve the QoS and to achieve the optimal path, the ‎SDN architecture is used in this paper. In addition, different routing algorithms are ‎used with different steps. First, we eva

... Show More
View Publication Preview PDF
Scopus (6)
Crossref (3)
Scopus Clarivate Crossref
Publication Date
Thu Aug 01 2024
Journal Name
Iop Conference Series: Earth And Environmental Science
Smart Irrigation Technique in the Fixed Irrigation System Based on Soil Moisture Content
...Show More Authors
Abstract<p>The growing water demand has raised serious concerns about the future of irrigated agriculture in many parts all over the world, changing environmental conditions and shortage of water (especially in Iraq) have led to the need for a new system that efficiently manages the irrigation of crops. With the increasing population growing at a rapid pace, traditional agriculture will have a tough time meeting future food demands. Water availability and conservation are major concerns for farmers. The configuration of the smart irrigation system was designed based on data specific to the parameters concerning the characteristics of the plant and the properties of soil which are measured once i</p> ... Show More
View Publication
Scopus (3)
Crossref (2)
Scopus Crossref
Publication Date
Sun Jan 14 2018
Journal Name
Journal Of Engineering
Optimum Design of Power System Stabilizer based on Improved Ant Colony Optimization Algorithm
...Show More Authors

This paper presents an improved technique on Ant Colony Optimization (ACO) algorithm. The procedure is applied on Single Machine with Infinite Bus (SMIB) system with power system stabilizer (PSS) at three different loading regimes. The simulations are made by using MATLAB software. The results show that by using Improved Ant Colony Optimization (IACO) the system will give better performance with less number of iterations as it compared with a previous modification on ACO. In addition, the probability of selecting the arc depends on the best ant performance and the evaporation rate.

 

View Publication Preview PDF
Publication Date
Sat Mar 21 2020
Journal Name
Journal Of Engineering
Development of Iraqi license plate recognition system based on Canny edge detection method
...Show More Authors

In recent years, there has been expanding development in the vehicular part and the number of vehicles moving on the road in all the sections of the country. Vehicle number plate identification based on image processing is a dynamic area of this work; this technique is used for security purposes such as tracking of stolen cars and access control to restricted areas. The License Plate Recognition System (LPRS) exploits a digital camera to capture vehicle plate numbers is used as input to the proposed recognition system. Basically, the developing system is consist of three phases, vehicle license plate localization, character segmentation, and character recognition, the License Plate (LP) detection is presented using canny Edge detection algo

... Show More
Publication Date
Wed Jul 01 2020
Journal Name
Journal Of Engineering
Development of Iraqi License Plate Recognition System based on Canny Edge Detection Method
...Show More Authors

In recent years, there has been expanding development in the vehicular part and the number of vehicles moving on the road in all the sections of the country. Vehicle number plate identification based on image processing is a dynamic area of this work; this technique is used for security purposes such as tracking of stolen cars and access control to restricted areas. The License Plate Recognition System (LPRS) exploits a digital camera to capture vehicle plate numbers is used as input to the proposed recognition system. Basically, the developing system is consist of three phases, vehicle license plate localization, character segmentation, and character recognition, the License Plate (LP) detection is presented using canny

... Show More
View Publication Preview PDF
Crossref (4)
Crossref
Publication Date
Fri May 04 2018
Journal Name
Wireless Personal Communications
IFRS: An Indexed Face Recognition System Based on Face Recognition and RFID Technologies
...Show More Authors

View Publication
Scopus (11)
Crossref (8)
Scopus Clarivate Crossref
Publication Date
Fri May 13 2022
Journal Name
Electronics
Fuzzy Luenberger Observer Design for Nonlinear Flexible Joint Robot Manipulator
...Show More Authors

The process of controlling a Flexible Joint Robot Manipulator (FJRM) requires additional sensors for measuring the state variables of flexible joints. Therefore, taking the elasticity into account adds a lot of complexity as all the additional sensors must be taken into account during the control process. This paper proposes a nonlinear observer that controls FJRM, without requiring equipment sensors for measuring the states. The nonlinear state equations are derived in detail for the FJRM where nonlinearity, of order three, is considered. The Takagi–Sugeno Fuzzy Model (T-SFM) technique is applied to linearize the FJRM system. The Luenberger observer is designed to estimate the unmeasured states using error correction. The develop

... Show More
View Publication
Scopus (10)
Crossref (10)
Scopus Clarivate Crossref
Publication Date
Tue Jan 01 2008
Journal Name
Journal Of Engineering
USING FUZZY LOGIC CONTROLLER FOR A TWO- TANK LEVEL CONTROL SYSTEM
...Show More Authors

This paper presents a fuzzy logic controller for a two-tank level control system, which is a process with a dead time. The fuzzy controller is a proportional-integral (PI-like) fuzzy controller which is suitable for steady state behavior of the system. Transient behavior of the system was improved without the need for a derivative action by suitable change in the rule base of the controller. Simulation results showed the step response of the two-tank level control system when this controller was used to control this plant and the effect of the dead time on the response of the system.

Publication Date
Sun Apr 08 2018
Journal Name
Al-khwarizmi Engineering Journal
Building a Management System to Control the Construction Claims in Iraq
...Show More Authors

The paper deals with claims in construction projects in Iraq and studies their types, causes, impacts, resolution methods and then proposes a management system to control the impacts of claims. Two parts have been done to achieve the research objective (theoretical part and practical part). The findings showed that the main types of the claims are extra work claims, different site condition claims, delay claims and the main causes of the claims are variation of the orders, design errors and omission, delay in payments by owner, variation in quantities and scheduling errors. The claims have bad impacts on the cost by increasing (10% to 25%) and also on the duration of the project by increasing from (25% to 50%).The negotiation is the main

... Show More
View Publication Preview PDF
Crossref (5)
Crossref