Unlike welding, soldering does not involve melting the work pieces. Soldering is a process in which two or more items are joined together by melting and putting a filler metal (solder) into the joint. Failure in the solder joint may make the system components lose their functions. Electrical wiring and electronic components are joined to devices and printed circuit boards using soldering. Soldering and brazing are both used in the assembly of musical instruments. Lead-tin alloy solder employed in the current investigation which has a diameter of 4 mm and a density of 11.0103 kg/m3 with continuous heat flux heating from the domain's left side and complete insulation on the other side. The melting of PCM was simulated using the ANSYS (Fluent) melting model. Three procedures were followed during the heating stage of the reflow process to perform the melting heat-transfer analysis. The simulation's results were recorded at regular intervals of 15 seconds. The results show melting rate increases as time proceeds. It is almost the same at the initial stages and increases in the middle and the end of the melting process. Heat transfer happens mostly through conduction during the first 0–30 seconds of the melting process, changing to natural convection as the material continues to heat up.
Interleukin-38 (IL-38), an inflammatory cytokine discovered in recent years, has been implicated in the pathogenesis of systemic lupus erythematosus (SLE). IL-38 is encoded by the
Flow-production systems whose pieces are connected in a row may not have maintenance scheduling procedures fixed because problems occur at different times (electricity plants, cement plants, water desalination plants). Contemporary software and artificial intelligence (AI) technologies are used to fulfill the research objectives by developing a predictive maintenance program. The data of the fifth thermal unit of the power station for the electricity of Al Dora/Baghdad are used in this study. Three stages of research were conducted. First, missing data without temporal sequences were processed. The data were filled using time series hour after hour and the times were filled as system working hours, making the volume of the data relativel
... Show MoreThis study investigated a novel application of forward osmosis (FO) for oilfield produced water treatment from the East Baghdad oilfield affiliated to the Midland Oil Company (Iraq). FO is a part of a zero liquid discharge system that consists of oil skimming, coagulation/flocculation, forward osmosis, and crystallization. Treatment of oilfield produced water requires systems that use a sustainable driving force to treat high-ionic-strength wastewater and have the ability to separate a wide range of contaminants. The laboratory-scale system was used to evaluate the performance of a cellulose triacetate hollow fiber CTA-HF membrane for the FO process. In this work, sodium chloride solution was used as a feed solution (FS) with a concentratio
... Show MoreTungsten inert gas arc welding–based shaped metal deposition is a novel additive manufacturing technology which can be used for fabricating solid dense parts by melting a cold wire on a substrate in a layer-by-layer manner via continuous DC arc heat. The shaped metal deposition method would be an alternative way to traditional manufacturing methods, especially for complex featured and large-scale solid parts manufacturing, and it is particularly used for aerospace structural components, manufacturing, and repairing of die/molds and middle-sized dense parts. This article presents the designing, constructing, and controlling of an additive manufacturing system using tungsten inert gas plus wire–based shaped metal deposition metho
... Show MoreABSTRACT
The current research aims at highlighting the role of engagement of a sample of employees who works in some of the Iraqi private banks in terms of their interaction , commitment and enthusiasm and the positive impact they own regarding their job and devote their efforts to achieve the core purpose which is customer loyalty. The problem was expressed through a number of intellectual and practical questions.
In order to achieve the aim of the research the quantitative analytical method was used depending on a questionnaire as a basic tool to collect research data and the qualitative survey method depending on semi-structured interviews which were distrib
... Show MoreThe aim of this study was to assess the nutritional status for samples at the age of 17-15 years. These samples were taken from secondary schools and universities in Baghdad area, 123 of them were male and 261 were female. Data on weight, height and body mass index (BMI) were determined in each individual. Smaller sample of 215 individuals (male and female) from the original sample was taken in order to record their nutritional behavior and daily food intake during the 24 hours prior to the visit through personal meeting using special questionnaire. The results showed that the weight and the height were within the range of the people of neighboring Arab countries, who are in the same age. Beside 44.4- 55.95% of these samples were within t
... Show MoreThe study aims to identify the effects of dubbed Turkish drama on the public through the application of a sample of the views of women. The study also attempts to monitor the causes and motives due to the act of observation and to identify the various effects of this act. In order to achieve these goals, the researcher relies on the descriptive approach in addition to the questionnaire and interviews to collect data. It ends with a number of results such as: The study aims to identify the effects of dubbed Turkish drama on the public through the application of a sample of the views of women. The study also attempts to monitor the causes and motives due to the act of observation and to identify the various effects of this act. In ord
... Show MoreStrives Total Productive Maintenance to increase the overall effectiveness of the equipment through the early involvement in the design and manufacture of equipment productivity. It also operates in an environment of simultaneous engineering work on the synchronization of activities to take advantage of early information by maintenance engineers, design, operation, and that helps to reduce the faults and facilitate future maintenance tasks.
Has adopted a search in the theoretical concept of the total maintenance productivity and concurrent engineering activities carried out during which the conjunction a
... Show More