Whenever, the Internet of Things (IoT) applications and devices increased, the capability of the its access frequently stressed. That can lead a significant bottleneck problem for network performance in different layers of an end point to end point (P2P) communication route. So, an appropriate characteristic (i.e., classification) of the time changing traffic prediction has been used to solve this issue. Nevertheless, stills remain at great an open defy. Due to of the most of the presenting solutions depend on machine learning (ML) methods, that though give high calculation cost, where they are not taking into account the fine-accurately flow classification of the IoT devices is needed. Therefore, this paper presents a new model based on the Spike Neural Network (SNN) called IoT-Traffic Classification (IoT-TCSNN) to classify IoT devices traffic. The model consists of four phases: data preprocessing, feature extraction, classier and evaluation. The proposed model performance is evaluated according to evaluation metrics: accuracy, precision, recall and F1-score and energy usage in comparison with two models: ML based Support Vector Machine IoT-TCSVM and ML based Deep Neural Network (IoT-TCDNN). The evaluations result has been shown that IoT-TCSNN consumes less energy in contrast to IoT-TCDNN and IoT-TCSVM. Also, it gives high accuracy in comparison with IoT-TCSVM.
<p><span>A Botnet is one of many attacks that can execute malicious tasks and develop continuously. Therefore, current research introduces a comparison framework, called BotDetectorFW, with classification and complexity improvements for the detection of Botnet attack using CICIDS2017 dataset. It is a free online dataset consist of several attacks with high-dimensions features. The process of feature selection is a significant step to obtain the least features by eliminating irrelated features and consequently reduces the detection time. This process implemented inside BotDetectorFW using two steps; data clustering and five distance measure formulas (cosine, dice, driver & kroeber, overlap, and pearson correlation
... Show MorePassive optical network (PON) is a point to multipoint, bidirectional, high rate optical network for data communication. Different standards of PONs are being implemented, first of all PON was ATM PON (APON) which evolved in Broadband PON (BPON). The two major types are Ethernet PON (EPON) and Gigabit passive optical network (GPON). PON with these different standards is called xPON. To have an efficient performance for the last two standards of PON, some important issues will considered. In our work we will integrate a network with different queuing models such M/M/1 and M/M/m model. After analyzing IPACT as a DBA scheme for this integrated network, we modulate cycle time, traffic load, throughput, utilization and overall delay
... Show MoreThe purpose of this paper is to identifying the values of some physical and Bio- Kinematic variables during the performance of the jump spike serve skill, and identifying the effect of the proposed training program using intermittent training to develop some physical and Bio- Kinematic variables and accuracy of the jump spike serve skill among the research sample. The experimental method was used and the research was conducted on a deliberately chosen sample of the players of the Army Club, who were primarily advanced in volleyball, and the number of the sample was (10) players. The conclusions were reached that the proposed training program using intermittent training has a positive effect on some of the physical and Bio- Kinematic variabl
... Show MoreThis paper assesses the impact of changes and fluctuations in bank deposits on the money supply in Iraq. Employing the research constructs an Error Correction Model (ECM) using monthly time series data from 2010 to 2015. The analysis begins with the Phillips-Perron unit root test to ascertain the stationarity of the time series and the Engle and Granger cointegration test to examine the existence of a long-term relationship. Nonparametric regression functions are estimated using two methods: Smoothing Spline and M-smoothing. The results indicate that the M-smoothing approach is the most effective, achieving the shortest adjustment period and the highest adjustment ratio for short-term disturbances, thereby facilitating a return
... Show MoreThe increasing demand for durable and multifunctional separation materials necessitates polymer‐based coatings that combine mechanical robustness with high selectivity. This study aims to develop antibacterial oil/water separation systems that effectively address challenges posed by microorganisms, which can decrease filter effectiveness and impact overall separation efficiency. Metal meshes were coated with titanium dioxide (TiO 2 ), octadecanethiol (ODT), and polyvinylidene fluoride (PVDF) via spray coating using four formulations: TiO 2
This study uses load factor and loss factor to determine the power losses of the electrical feeders. An approach is presented to calculate the power losses in the distribution system. The feeder’s technical data and daily operation recorded data are used to calculate and analyze power losses.
This paper presents more realistic method for calculating the power losses based on load and loss factors instead of the traditional methods of calculating the power losses that uses the RMS value of the load current which not consider the load varying with respect to the time. Eight 11kV feeders are taken as a case study for our work to calculate load factor, loss factor and power losses. Four of them (F40, F42, F43 and F
... Show MoreProjects suspensions are between the most insistent tasks confronted by the construction field accredited to the sector’s difficulty and its essential delay risk foundations’ interdependence. Machine learning provides a perfect group of techniques, which can attack those complex systems. The study aimed to recognize and progress a wellorganized predictive data tool to examine and learn from delay sources depend on preceding data of construction projects by using decision trees and naïve Bayesian classification algorithms. An intensive review of available data has been conducted to explore the real reasons and causes of construction project delays. The results show that the postpo