Physically based modeling approach has been widely developed in recent years for the simulation of dam failure process due to the lack of field data. This paper provides and describes a physically-based model depending on dimensional analysis and hydraulic simulation methods for estimating the maximum water level and the wave propagation time from breaching of field test dams. The field physical model has been constructed in Dabbah city to represent the collapse of the Roseires dam in Sudan. Five cases of a dam failure were studied to simulate water flood conditions by changing initial water height in the reservoir (0.8, 1.0, 1.2, 1.4 and 1.5 m respectively).The physical model working under five cases, case 5 had the greatest influence of the water wave movement in the canal downstream. The results showed the collapse of the dam and the sides of the canal due to the high water levels recorded 277.001, 277.084 and 277.161 m Above Mean Sea Level (AMSL) at section 13 in the canal. The wave vanishing time was 70 minutes from the beginning of the failure at a distance of 590 m downstream. The dam collapse leads to cover the sides of the canal completely, especially at the distance of 371 m.
Nasryia oil field is located about 38 Km to the north-west of Nasryia city. The field was discovered in 1975 after doing seismic by Iraqi national oil company. Mishrif formation is a carbonate rock (Limestone and Dolomite) and its thickness reach to 170m. The main reservoir is the lower Mishrif (MB) layer which has medium permeability (3.5-100) md and good porosity (10-25) %. Form well logging interpretation, it has been confirmed the rock type of Mishrif formation as carbonate rock. A ten meter shale layer is separating the MA from MB layer. Environmental corrections had been applied on well logs to use the corrected one in the analysis. The combination of Neutron-Density porosity has been chosen for interpretation as it is c
... Show MoreWe presented here a 65years old lady with an unusual presentation of a large epigastric hernia of twenty years duration .The swelling was occupying all the right hypochondrial region .The diagnosis was made on r^E^a-operative identification of the defect in the linea alba which wassutured after removal of the hernial sac and its contents .The postoperative course was uneventful and the patient remained with no complications or recurrence for more than two years follow up.
Diverting river flow during construction of a main dam involves the construction of cofferdams, and tunnels, channels or other temporary passages. Diversion channels are commonly used in wide valleys where the high flow makes tunnels or culverts uneconomic. The diversion works must form part of the overall project design since it will have a major impact on its cost, as well as on the design, construction program and overall cost of the permanent works. Construction costs contain of excavation, lining of the channel, and construction of upstream and downstream cofferdams. The optimization model was applied to obtain optimalchannel cross section, height of upstream cofferdam, and height of downstream cofferdamwith minimum construction cost
... Show MoreThe AlAdhaim Dam is located 133 kilometers northeast of Baghdad. It is a multipurpose dam and joints the Iraqi dam system in 2000. It has a storage capacity of 1.5 billion m3. The dam has an ogee spillway with a length of 562 m, a crest level of 131.5 m.a.m.s.l. and a maximum discharge capacity of 1150 m3/s at its maximum storage height of 143 m.a.m.s.l. This research aimed to investigate the hydrodynamics performance of the spillway and the stilling basin of AlAdhiam Dam by using numerical simulation models under gated situations. It was suggested to modify the dam capacity by increasing the dam's storage capacity by installing gates on the crest of the dam spillway. The FLUENT program was used to
... Show MoreIn petroleum reservoir engineering, history matching refers to the calibration process in which a reservoir simulation model is validated through matching simulation outputs with the measurement of observed data. A traditional history matching technique is performed manually by engineering in which the most uncertain observed parameters are changed until a satisfactory match is obtained between the generated model and historical information. This study focuses on step by step and trial and error history matching of the Mishrif reservoir to constrain the appropriate simulated model. Up to 1 January 2021, Buzurgan Oilfield, which has eighty-five producers and sixteen injectors and has been under production for 45 years when it started
... Show MoreIn this paper, the Monte-Carlo simulation method was used to compare the robust circular S estimator with the circular Least squares method in the case of no outlier data and in the case of the presence of an outlier in the data through two trends, the first is contaminant with high inflection points that represents contaminant in the circular independent variable, and the second the contaminant in the vertical variable that represents the circular dependent variable using three comparison criteria, the median standard error (Median SE), the median of the mean squares of error (Median MSE), and the median of the mean cosines of the circular residuals (Median A(k)). It was concluded that the method of least squares is better than the
... Show MoreIn this paper new methods were presented based on technique of differences which is the difference- based modified jackknifed generalized ridge regression estimator(DMJGR) and difference-based generalized jackknifed ridge regression estimator(DGJR), in estimating the parameters of linear part of the partially linear model. As for the nonlinear part represented by the nonparametric function, it was estimated using Nadaraya Watson smoother. The partially linear model was compared using these proposed methods with other estimators based on differencing technique through the MSE comparison criterion in simulation study.
Abstract
The aim of this work is to create a power control system for wind turbines based on fuzzy logic. Three power control loop was considered including: changing the pitch angle of the blade, changing the length of the blade and turning the nacelle. The stochastic law was given for changes and instant inaccurate assessment of wind conditions changes. Two different algorithms were used for fuzzy inference in the control loop, the Mamdani and Larsen algorithms. These two different algorithms are materialized and developed in this study in Matlab-Fuzzy logic toolbox which has been practically implemented using necessary intelligent control system in electrical engineerin
... Show MoreBackground
Respiratory tract aspergillosis is a pulmonary disease cause by aspergillus species which are opportunistic fungi that mainly infect immuno-compromised patients .
Objective(s)
The present study aimed to detect the frequency of pulmonary aspergillosis among clinically suspected and under follow up tuberculosis patients conducted at Tropical Diseases Teaching Hospital, Omdurman, Khartoum State , Sudan during the period from December 2019 to November 2020.
Materials and Methods
One hundred and fifty sputum samples were collected from suspected cases of pulmonary tuberculosis and under follow up tuberculosis patients. All specimens were examined using 20% KOH and cultured on two
... Show More