Diverting river flow during construction of a main dam involves the construction of cofferdams, and tunnels, channels or other temporary passages. Diversion channels are commonly used in wide valleys where the high flow makes tunnels or culverts uneconomic. The diversion works must form part of the overall project design since it will have a major impact on its cost, as well as on the design, construction program and overall cost of the permanent works. Construction costs contain of excavation, lining of the channel, and construction of upstream and downstream cofferdams. The optimization model was applied to obtain optimalchannel cross section, height of upstream cofferdam, and height of downstream cofferdamwith minimum construction costs for diversion works which is solved by PSO method using MATLAB. The optimization model was applied to prepare the optimal design graphs.It can be noticed, at any design flowrate, optimalwater flow depth, bed width, and height of upstream and downstream cofferdams decrease with increase of the side-slope. Also, it can be observed, at any design flowrate, the construction cost increases with increase of the side-slope.
Shatt Al-Diwaniya branches from Shatt Al-Hilla and extends for about 112 km until the Al-Rumaitha district within the study area located in Al-Diwaniya Governorate, Iraq. It is considered the main source for providing drinking water and supplying irrigation projects to the cities Al-Diwaniya and Al-Rumaitha. The study aims to evaluate, study, and develop Shatt Al-Diwaniya, as well as the new lined canal branching from Shatt Al-Diwaniya which. It is called Shatt Al-Diwaniya Diversion Canal. Field measurements of the discharge and water level were monitored, six sets for Shatt Al-Diwaniya and three sets for Diversion Canal. A one-dimensional model was developed by using HEC-RAS 5.0.7 so
Mandali Dam is one of the small dams in Iraq; it is located on Haran Wadi, Gangir, just 3km north-east Mandali City. Mandali dam consists of four main parts, the dam body, the intake structure, the spillway, and the bottom outlet. The dam body is zoned earth filled with a central core. The main purposes of the dam are to maintain flow of Wadi Haran, supplying irrigation and drinking water to Mandali City, and recharging the groundwater. Over a period of seven years of operation, the dam lost its ability to store water due to accumulated sediments within its reservoir. The accumulated sediment is about 2.25million m3. The average annual rate of reduction during this period is about 0.321
... Show MoreOptimization of gas lift plays a substantial role in production and maximizing the net present value of the investment of oil field projects. However, the application of the optimization techniques in gas lift project is so complex because many decision variables, objective functions and constraints are involved in the gas lift optimization problem. In addition, many computational ways; traditional and modern, have been employed to optimize gas lift processes. This research aims to present the developing of the optimization techniques applied in the gas lift. Accordingly, the research classifies the applied optimization techniques, and it presents the limitations and the range of applications of each one to get an acceptable level of accura
... Show MoreContemporary architecture has witnessed a new innovative trend in design characterized by the creation of interesting free-flowing structures that reflect expressiveness of form and design, as well as the uniqueness of structure and approaches of construction. These fascinating structures are often perceived as landmarks that blend harmoniously into their surroundings. In the last two decades, parametric design and advanced computational tools, with prefabrication and construction techniques, enabled architects and engineers to explore new materials and methods to create such impressive structures, breaking the obsolete ways of thinking. Several examples of free-form structures lack obviously to explore architectural potentialities,
... Show MoreTechnique was used to retail for analyzing atom beryllium ion cathode of an atom lithium to six pairs of functions wave which two ?????? and the rest of the casing moderation and to analyze atom lithium ion Mob atom beryllium to three pairs of functions wave pair of casing and the rest of the casing moderation using function wave Hartree Fock and each casing email wascalculate expected values ??....
The expansion in water projects implementations in Turkey and Syria becomes of great concern to the workers in the field of water resources management in Iraq. Such expansion with the absence of bi-lateral agreement between the three riparian countries of Tigris and Euphrates Rivers; Turkey, Syria and Iraq, is expected to lead to a substantially reduction of water inflow to the territories of Iraq. Accordingly, this study consists of two parts: first part is aiming to study the changes of the water inflow to the territory of Iraq, at Turkey and Syria borders, from 1953 to 2009; the results indicated that the annual mean inflow in Tigris River was decreased from 677 m3/sec to 526 m3/sec, after operating Turkey reserv
... Show MoreA low speed open circuit wind tunnel has been designed, manufactured and constructed at the Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the first part of the work; that is the design calculations, simulation and construction. It will be followed by a second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70 m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow disturbances in the test section.
... Show MoreThe maximization of the net present value of the investment in oil field improvements is greatly aided by the optimization of well location, which plays a significant role in the production of oil. However, using of optimization methods in well placement developments is exceedingly difficult since the well placement optimization scenario involves a large number of choice variables, objective functions, and restrictions. In addition, a wide variety of computational approaches, both traditional and unconventional, have been applied in order to maximize the efficiency of well installation operations. This research demonstrates how optimization approaches used in well placement have progressed since the last time they were examined. Fol
... Show More