Preferred Language
Articles
/
BRa9CYcBVTCNdQwC9zGe
Assessing BIM Integration with Sustainable Requirement for Buildings Construction
...Show More Authors

Crossref
View Publication
Publication Date
Sun Oct 01 2017
Journal Name
Journal Of Educational And Psychological Researches
Construction Bullying scale for Kindergarten child
...Show More Authors

Construction of photographed bullying scale of kindergarteners was the aim of this study. The study conducted to answer the raised question, could the bullying among kindergarteners be measured?. A total of (200) boy and girl were selected from city of Baghdad to be the sample of the study. The scale composed of (27) item with colored pictures. It takes about (15) minuets to answer the whole scale items. SPSS tools were used to process the collected data. The result showed that the bullying among kindergarteners could be measured.

View Publication Preview PDF
Publication Date
Sun Apr 11 2021
Journal Name
Environment, Development And Sustainability
Developing a system for assessing the sustainability in school building projects
...Show More Authors

View Publication
Crossref (11)
Clarivate Crossref
Publication Date
Fri Jan 01 2010
Journal Name
Positioning
Fluid Inclusions Usage for Assessing Oil Migration in Duhok, North Iraq
...Show More Authors

View Publication
Crossref (5)
Crossref
Publication Date
Wed Nov 17 2021
Journal Name
International Journal Of Knowledge Management
Assessing the Success of the Perceived Usefulness for Knowledge Management Systems
...Show More Authors

Recently, Knowledge Management Systems (KMS) consider one of the major fields of study in educational institutions, caused by the necessity to identify their knowledge value and success. Hence, based on the updated DeLone and McLean’s Information Systems Success Model (DMISSM), this study set out to assess the success of the Perceived Usefulness of Knowledge Management Systems (PUKMS) in Iraqi universities. To achieve this objective, the quantitative method is selected as the research design. In total, 421 university administration staff members from 13 Iraqi private universities were conducted. This study highlights a number of significant results depending on structural equation modeling which confirms that system, information, and s

... Show More
View Publication
Scopus (6)
Crossref (5)
Scopus Clarivate Crossref
Publication Date
Mon Apr 06 2020
Journal Name
Asian Journal Of Civil Engineering
Integrated project delivery (IPD) method with BIM to improve the project performance: a case study in the Republic of Iraq
...Show More Authors

View Publication
Scopus (22)
Crossref (23)
Scopus Crossref
Publication Date
Sat Aug 12 2017
Journal Name
Journal Of Engineering
Regulations Enforcement Mechanisms for Sustainable Housing Projects
...Show More Authors


 

View Publication Preview PDF
Publication Date
Sat Aug 01 2020
Journal Name
Iop Conference Series: Materials Science And Engineering
Developing Systems Engineering for Sustainable Infrastructure Projects
...Show More Authors
Abstract<p>Globally, Sustainability is very quickly becoming a fundamental requirement of the construction industry as it delivers its projects; whether buildings or infrastructures. Throughout more than two decades, many modeling schemes, evaluation tools, and rating systems have been introduced en route to realizing sustainable construction. Many of these, however, lack consensus on evaluation criteria, a robust scientific model that captures the logic behind their sustainability performance evaluation, and therefore experience discrepancies between rated results and actual performance. Moreover, very few of the evaluation tools available satisfactorily address infrastructure projects. The res</p> ... Show More
View Publication
Scopus (4)
Crossref (3)
Scopus Crossref
Publication Date
Fri Dec 01 2017
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Integration between value chain analysis and balanced scorecard to for performance evaluation
...Show More Authors

The performance evaluation process requires a set of criteria and for the purpose of measuring the level of performance achieved by the Unit and the actual level of development of its activities, and in view of the changes and of rapid and continuous variables surrounding the Performance is a reflection of the unit's ability to achieve its objectives, as these units are designed to achieve the objectives of exploiting a range of economic resources available to it, and the performance evaluation process is a form of censorship, focusing on the analysis of the results obtained from the achievement All its activities with a view to determining the extent to which the Unit has achieved its objectives using the resources available to it and h

... Show More
View Publication
Crossref (1)
Crossref
Publication Date
Fri Jan 01 2021
Journal Name
Aip Conference Proceedings
Integration between hydrochemical and physical data with geographic information systems (GIS) for selecting the best locations groundwater wells in Baghdad city
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Sun Jan 01 2023
Journal Name
International Journal Of Economics And Finance Studies
INTEGRATION BETWEEN COBIT AND COSO FOR INTERNAL CONTROL AND ITS REFLECTION ON AUDITING RISK WITH CORPORATE GOVERNANCE AS THE MEDIATING VARIABLE
...Show More Authors

Scopus (26)
Scopus