The information required for construction quantities surveying is not only generated by various participants in different construction phases but also stored in different forms including graphics, text, tables, or various combinations of the three. To report a bill of quantities (BOQ), the project manager has to continuously excerpt information from various resources and record it on papers. Without adequate staff and time, this repetitive and tedious process is difficult for the project manager to handle properly and thus reduces the effectiveness and the accuracy of the quantities surveying process which creates problems during the design, tender, and construction supervision of construction projects for designers and contractors pract
... Show MoreThe theatre costume with the rest of the theatre show elements constitute a system of the meaning relations that produce a visual image that helps the recipient to decipher the theatre scene, let alone the manifestation of time in its levels (past, present, future) through the design construction of the theatre elements among which is the theatre costume. In order to know the way of manifesting time through the formulation of the theatre costumes, the research question has been put as follows: how to manifest time through the design construction for the theatre costumes unit, from which the research objective is derived as follows: Revealing the possibility of the designing unit of the costumes in manifesting the levels of time wit
... Show MoreThis study looks into the many methods that are used in the risk assessment procedure that is used in the construction industry nowadays. As a result of the slow adoption of novel assessment methods, professionals frequently resort to strategies that have previously been validated as being successful. When it comes to risk assessment, having a precise analytical tool that uses the cost of risk as a measurement and draws on the knowledge of professionals could potentially assist bridge the gap between theory and practice. This step will examine relevant literature, sort articles according to their published year, and identify domains and qualities. Consequently, the most significant findings have been presented in a manne
... Show MoreRapid worldwide urbanization and drastic population growth have increased the demand for new road construction, which will cause a substantial amount of natural resources such as aggregates to be consumed. The use of recycled concrete aggregate could be one of the possible ways to offset the aggregate shortage problem and reduce environmental pollution. This paper reports an experimental study of unbound granular material using recycled concrete aggregate for pavement subbase construction. Five percentages of recycled concrete aggregate obtained from two different sources with an originally designed compressive strength of 20–30 MPa as well as 31–40 MPa at three particle size levels, i.e., coarse, fine, and extra fine, were test
... Show MoreImpairment of financial assets defined according to IFRS 9 as the difference between all contractual cash flows that are due to an entity in accordance with the contract and all the cash flows that the entity expects to receive, the entity should estimates all the cash flows through looking to the contract terms during the life time period of the assets or for shorter period if possible, the cash flow should include the amounts of selling any collateral taken or any other enhancement. On the other hand, the Central bank of Iraq guidelines regards impairment differ from the IFRS 9 that’s does not consider the collateral value on calculating the impairment that’s effects on the net profit through recognizing exaggerated loss an
... Show MoreContracting companies play a prominent role today in economic activity, due to their contribution to the implementation of major construction projects which together constitute the infrastructure of society. Most construction projects also suffer from exceeding the time and cost specified and planned for the completion of the project, and this comes for several reasons, including the work environment, country conditions, The method of managing project costs and the techniques used in its implementation Accordingly, the concepts of lean construction came, which help in addressing the causes of waste, both in time and cost, in addition to the fact that project management needs techniques that are useful in controlling the control and manag
... Show Moreفي هذا البحث تم تحضير المركبات المعدنية النانوية الجديدة لأيونات البلاتين 4+و الذهب 3+ مع ليكاند قاعدة مانخ جديد مشتق من السيبروفلوكساسين بطريقة الموجات فوق الصوتية. تم تشخيص المعقدات النانوية والليكاند الجديد بأستخدام تقنيات فيزيائية و كيميائية مختلفة مثل أطياف الاشعة تحت الحمراء، حيود الاشعة السينية ، المجهر الالكتروني الماسح ، المجهر الالكتروني النافذ و مجهر القوة الذرية. تم تحديد نشاط مضادات الأك
... Show MoreThe environmental problems that have emerged recently as a result of pressure on the environment due to the increase in population size, especially in urban cities, where this increase was accompanied by the need for housing as well as the need for services and activities. This led to the establishment of many vertical residential buildings represented by residential complexes within the urban fabric of the city of Baghdad. As part of following the methodology of urban dictation policies in empty areas, and to accommodate the largest number of residents as a result of the multiplicity of floors and housing, these buildings must be subject to the standards and requirements of sustainability at the level of their spatial location and their
... Show More