Inundation floodingmap aimedto find outearly warningsto avoidenvironmental damageandhumanin terms of theheight ofthe wave ofwater, speed time arrival, effects of inundation sideanddepth of the water/ distanceand reduce the impact of the flood wave after obtaining the process of collapse of the dam in the lower part of the river to the dam area. The study has been using a numerical model one-dimensional depends on the development of equations (Saint-Venant) so that parts of the river, any river channel main banks of the right and left treated as separate parts, that’s the difference in the characteristics of the hydraulic and engineering, along the line of the flow will take into account in each section of the sections and flow in the river valley. Throughapplied numerical model of the Nile River in the area between the Roseires dam and Khartoum is distance (630 km) south of Khartoum , to get a jest analysis of the impact of a wave of flooding in the river on the following parameters : the maximum discharge , the maximum of attributed, as underdevelopment of the discharge maximum , and the time defaults to the maximum level and the surface area on the banks of the river and its extension and different values of the coefficient of manning roughness to the banks of the river. Eight scenario have been prepared for the flood wave read to compare the effect amount of water flow in the channel resulting from the collapse of the dam was resulting of Roseires dam , eight scenario to represent the five and extract the resulting values of Inundation map to cities located on the downstream of the dam.Thefive scenarioswerecalculated by using (HEC-RAS 4.1.0), (HEC-GeoRAS)a GIS programs and the flood wave resulting from the collapse of the Roseires dam to compare the results showed that the scenario NO. 5 is the best scenario result from the collapse makes sense due to the form of the disposal of the flood wave resulting from the collapse of the Roseires dam and then get overtopping from Sennar dam to the inability of the reservoir and dam to stop the flood wave. The results also indicate that the time needed to reach the greatest discharge of the flood wave resulting from the collapse of the Roseires dam to the city of Khartoum is ( 4, 6, 7and 9 ) day on the cities ( Roseires , Sennar , Wad Medani and Khartoum ) respectively, of the cases . The maximum height of the flood wave reaching the city of Khartoum has given the scenario NO. 5 by height wave (3-50) meters respectively. As well as the delay in the arrival time of the maximum height of the flood wave to the city of Khartoum is one day for the five scenarios compared to the other. The Inundation map development resulting from the collapse of the Roseires dam and get the flow overtopping the Sennar dam, arrival to Khartoum, was determined the surface area of the affected river and both banks of the depth of the wave and latency along the river has been selected four major cities along the river which Roseires,Sennar, Wad Medani and Khartoum.
Simulation of direct current (DC) discharge plasma using
COMSOL Multiphysics software were used to study the uniformity
of deposition on anode from DC discharge sputtering using ring and
disc cathodes, then applied it experimentally to make comparison
between film thickness distribution with simulation results. Both
simulation and experimental results shows that the deposition using
copper ring cathode is more uniformity than disc cathode
Efficient and cost-effective drilling of directional wells necessitates the implementation of best drilling practices and advanced techniques to optimize drilling operations. Failure to adequately consider drilling risks can result in inefficient drilling operations and non-productive time (NPT). Although advanced drilling techniques may be expensive, they offer promising technical solutions for mitigating drilling risks. This paper aims to demonstrate the effectiveness of advanced drilling techniques in mitigating risks and improving drilling operations when compared to conventional drilling techniques. Specifically, the advanced drilling techniques employed in Buzurgan Oil Field, including vertical drilling with mud motor, managed pres
... Show MoreProduction of fatty acid esters (biodiesel) from oleic acid and 2-ethylhexanol using sulfated zirconia as solid catalyst for the production of biodiesel was investigated in this work.
The parameters studied were temperature of reaction (100 to 130°C), molar ratio of alcohol to free fatty acid (1:1 to 3:1), concentration of catalyst (0.5 to 3%wt), mixing speed (500 to 900 rpm) and types of sulfated zirconia (i.e modified, commercial, prepared catalyst according to literature and reused catalyst). The results show the best conversion to biodiesel was 97.74% at conditions of 130°C, 3:1, 2wt% and 650 rpm using modified catalyst respectively. Also, modified c
... Show MoreThe change in project cost, or cost growth, occurs from many factors, some of which are related to soil problem conditions that may occurs during construction and/or during site investigation period. This paper described a new soil improvement method with a minimum cost solution by using polymer fiber materials having a length of (3 cm) in both directions and (2.5 mm) in thickness, distributed in uniform medium dense .
sandy soil at different depths (B, 1.5B and 2B) below the footings. Three square footings has been used (5,7.5 and 10 cm) to carry the above investigation by using lever arm loading system design for such purposes.
These fibers were distributed from depth of (0.1B) below the footing base down to the investigated dep
KE Sharquie, AA Noaimi, EA Al-Janabi…, Journal of Cosmetics, Dermatological Sciences and Applications, 2013 - Cited by 13
Among many problems that reduced the performance of the network, especially Wide Area Network, congestion is one of these, which is caused when traffic request reaches or exceeds the available capacity of a route, resulting in blocking and less throughput per unit time. Congestion management attributes try to manage such cases. The work presented in this paper deals with an important issue that is the Quality of Service (QoS) techniques. QoS is the combination effect on service level, which locates the user's degree of contentment of the service. In this paper, packet schedulers (FIFO, WFQ, CQ and PQ) were implemented and evaluated under different applications with different priorities. The results show that WFQ scheduler gives acceptable r
... Show MoreABSTRACT
The simulation of groundwater movement has been carried out by using MODFLOW model
in order to show the impact of change of water surface elevation of the Tigris river on layers of
the aquifer system for Nuclear Research Center at Al-Tuwaitha area, in addition to evaluate the
ability of the proposed pumping well to collect groundwater and change the direction of flow at
steady-state. The results of the study indicated that there is a good match between the values of
groundwater levels that calculated in the model and measured in the field, where mean error is
0.09 m.
The study also showed that the increasing of water surface elevation of the
The present study discusses one of the most relevant and required topics in the recent period during globalization, the modern Russian system of terms for the oil and gas industry as a whole acquired a complete form in the second half of the twentieth century. The period of the late XX - early XXI centuries. marked by cardinal transformations in all areas of the political, economic, social and cultural life of Russia. These changes could not but affect industrial production. Transition to a new vector of development of the Russian economy based on the development of commercial trade, on the change and improvement of the development of industrial enterprises in the context of the implementation of national projects and the introduction
... Show More