The advancements in horizontal drilling combined with hydraulic fracturing have been historically proven as the most viable technologies in the exploitation of unconventional resources (e.g., shale and tight gas reservoirs). However, the number of fractures, well timing, and arrangement pattern can have a significant impact on the project economy. Therefore, such design and operating parameters need to be efficiently optimized for obtaining the best production performance from unconventional gas reservoirs. In this study, the process of selecting the optimal number of fractures was conducted on a section of a tight gas reservoir model (based on data from the Whicher Range (WR) tight gas field in Western Australia). Then, the optimal number of wells per that section was investigated using the net present value (NPV) economic indicator assuming that the production process in all wells starts at the same time (base case). After that, three drilling schedules and patterns namely infill, linear, and hybrid were studied to examine the effect of two timing scenarios known as a fixed point in time and percentage of cumulative production (including the 37.5% EUR (estimated ultimate recovery) and the 62.5% EUR). It was shown that base case and infill drilling have the highest NPV values followed by hybrid and linear patterns in all the timing scenarios. However, the base case and infill drilling scheduling were more sensitive to the development time than hybrid and linear patterns. Additionally, the optimal number of wells per section was found to be a clear function of drilling pattern and lease time. The optimal number of wells (assuming 20 years lease period) was higher in the base case and infill pattern compared to the hybrid and linear pattern. The current study aims to help operators understand how well scheduling and pattern can change the optimal number of wells and thus aid them to reach educated decisions regarding the optimal development plan for the section under the lease. This study can also help operators to develop their management plan by selecting the best drilling pattern and timing to ensure the best return on investment.
Project management are still depending on manual exchange of information based on paper documents. Where design drawings drafting by computer-aided design (CAD), but the data needed by project management software can not be extracted directly from CAD, and must be manually entered by the user. The process of calculation and collection of information from drawings and enter in the project management software needs effort and time with the possibility of errors in the transfer and enter of information. This research presents an integrated computer system for building projects where the extraction and import quantities, through the interpretation of AutoCAD drawing with MS Access database of unit costs and productivities for the pricing and
... Show MoreNumerical study of separation control on symmetrical airfoil, four digits (NACA
0012) by using rotating cylinder with double steps on its upper surface based on the computation of Reynolds-average Navier- Stokes equations was carried out to find the optimum configuration of unconventional airfoil for best aerodynamics performance. A model based on collocated Finite Volume Method was developed to solve the governing equations on a body-fitted coordinate system. A revised (k-w) model was proposed as a known turbulence model. This model was adapted to simulate the control effects of rotating cylinder. Numerical solutions were performed for flow around unconventional airfoil with cylinder to main stream velocities ratio in the range
... Show MoreThat the building of the national economy depends on the extent of the possibility of transition from the rent economy seeking to increase GDP (GDP1), and the tendency to manage projects with external sources of funding, or allow projects with foreign capital is a necessity. The strategic challenges faced by the economy in countries that have experience in investment projects have faced several factors internal and external for a period of time and not a few and the pressures and difficulties and failures have affected in one way or another on the development work in that country. On this basis, the stakeholders have a role to pay attention to the issue of the feasibility of the pattern of foreign investment in the investment environment
... Show MoreAbstract
Most of the industrial organization in the world became suffering from the problem of the pollution of the poisonous chemicals things, this urged to depend on the principle of the responsible production, because it has the positive role by dealing with these chemical things and to safe the health of the society, due to the main goal of this study is to restrict the role responsible production in accomplishing the system of the environmental management through an actual study in the northern gas company in Kirkuk province, the topic has acquired a big importance bacause there were a limited number of studies and res
... Show MoreAbstract
Objectives: The main objective of this study is to find the influence level of nursing incivility on psychological well-being among nurses in southeastern Iraq.
Methods: In this descriptive correlational study, a convenience sample of 250 nurses working in three government hospitals in Missan province in the south of Iraq were surveyed using the nursing incivility scale (NIS) and Ryff's psychological well-being scale (PWB) from November 2021, to July 2022. A multivariate multiple regression analysis was done to analyze the multivariate effect of workplace incivility on the psychological well-being of nurses.
Results: The study results show a
... Show MoreMultilateral wells require a sophisticated type of well model to be applied in reservoir simulators to represent them. The model must be able to determine the flow rate of each fluid and the pressure throughout the well. The production rate calculations are very important because they give an indication about some main issues associated with multi-lateral wells such as one branch may produce water or gas before others, no production rate from one branch, and selecting the best location of a new branch for development process easily.  
... Show More