The main aim of this research is to introduce financing cost optimization and different financing alternatives. There are many studies about financing cost optimization. All previous studies considering the cost of financing have many shortcomings, some considered only one source of financing as a credit line without taking into account different financing alternatives. Having only one funding alternative powers, restricts contractors and leads to a very specific financing model. Although it is beneficial for the contractor to use a long-term loan to minimize interest charges and prevent a substantial withdrawal from his credit line, none of the existing financial-based planning models have considered long-term loans in
... Show MoreGenetic algorithms (GA) are a helpful instrument for planning and controlling the activities of a project. It is based on the technique of survival of the fittest and natural selection. GA has been used in different sectors of construction and building however that is rarely documented. This research aimed to examine the utilisation of genetic algorithms in construction project management. For this purpose, the research focused on the benefits and challenges of genetic algorithms, and the extent to which genetic algorithms is utilised in construction project management. Results showed that GA provides an ability of generating near optimal solutions which can be adopted to reduce complexity in project management and resolve difficult problem
... Show MoreThe management of construction projects needs to complete the basics of system management and work. Starting from the idea and how to turn it into a full study and ended at the construction project completion arriving at the purpose prepared for it, so the projects need to control on its operation and integration system in order to succeed.
It is no secret for who concerned in construction projects field that the design stage is a very important stage in construction project because it determines the final features of the project through the requirements provided by the employer for the consultant to formulate it during this phase in the form of plans, drawings, and specifications, then translated on the ground as the shape of co
... Show MoreConstruction projects are characterized as projects with multi phases and activities, complex, unique, and have many different parties and stakeholders. Risks could appear at one or more of the construction project stages and may affect the achievement of project objectives. Therefore, one of the key elements in the planning phase of any project is the risk management process (RMP). This study attempts to understand the terminology of risk in general, risk management, and response to risk in particular. This study is mainly a review of thirty-eight studies that have been published between 1997 and 2020 that demonstrate the importance of the crucial phase of risk response from the risk management process and its impact on
... Show MoreAs contemporary security requires the formulation of a comprehensive strategy based on multidimensional sub-strategies (economic, developmental, social, cybersecurity, military,and diplomatic dimensions to achieve so-called sustainable security and address the unconventional challenges that worsened with the turn of the twenty-first century and concerned with violent extremism, often leading to terrorism, Iraq, despite the reversal of the terrorist group ISIS in 2017, seems urgently needed to formulate effective strategies to counter violent extremism, Violent extremism has multiple internal and external reasons. These causes have increased due to local, regional, and international causes. Violent extremist factors began with the outbreak o
... Show MorePurpose – measure the relationship between operation management strategies as an independent variable on the customer's delight as an approved variable.
Design/methodology/approach – The research sample vocabulary included sales representatives and customers of the researched markets at a rate of (100%). The recovery rate is (95) Customers and (95) delegates for the products for the factory in neighbourhood (Banooks and Karrada ) regions were randomly chosen from an open community in these two residential areas. Statistical methods were used (arithmetic media, standard deviations, t-test, correlation coefficient (Horst), simple regression analysis).
Findings – The people in charge of the factory management nee
... Show MoreThe evolution in materials’ technology in the last decades resulted in interesting projects that aimed at preserving the environment and energy and reduce pollution. They have been taken the principles of environmental design as a basis for architectural thought, starting from the early stages of the design process ending in choosing appropriate building materials to achieve sustainable buildings, but these trying are limited in our local environment and there isn’t demanded seriousness. The research problem emerges in the ignorance of the environmental aspect (ecological system) when selecting building materials during design process to achieve sustainable buildings. The aim of this research is revealing the mechanisms of selecting
... Show MoreThe aim of this study is to investigate the nature of the relationship between domestic savings and domestic investment, or rather the efficiency of domestic savings in financing development in Algeria, in order to explain this relationship, identify the challenges to investment, and finance and accelerate economic growth. The economic measurement methodology has estimated the relationship between the savings rate and the local investment rate in the Algerian economy. We have annual data for the period 1970-2014. One of the most important conclusions is that there is no relationship between savings and investment, nor even an integration between them. To illustrate this, the use of some statistical tools, a
... Show More