The paper deals with claims in construction projects in Iraq and studies their types, causes, impacts, resolution methods and then proposes a management system to control the impacts of claims. Two parts have been done to achieve the research objective (theoretical part and practical part). The findings showed that the main types of the claims are extra work claims, different site condition claims, delay claims and the main causes of the claims are variation of the orders, design errors and omission, delay in payments by owner, variation in quantities and scheduling errors. The claims have bad impacts on the cost by increasing (10% to 25%) and also on the duration of the project by increasing from (25% to 50%).The negotiation is the main
... Show MoreThe research dealt with two variables first in the field of human resources represented by the empowerment of workers and second in operations through improved process in the framework of standards Quality Award European containing nine basic criteria (Leadership, Strategy, partnerships and resources, the results of the individuals, the results of the customer, the results of the community), including human resources and operations has been selected and the Ministry of Industry and Minerals as a community to search , which covered most of the industrial sectors of Iraq through the selection of a single company of every industrial sector and thus became the research sample (6 ) industrial companies in addition to the C
... Show MoreYY Lazim, NAB Azizan, 2nd International Conference on Innovation and Entrepreneurship, 2014
Abstract
This research aims to design a multi-objective mathematical model to assess the project quality based on three criteria: time, cost and performance. This model has been applied in one of the major projects formations of the Saad Public Company which enables to completion the project on time at an additional cost that would be within the estimated budget with a satisfactory level of the performance which match with consumer requirements. The problem of research is to ensure that the project is completed with the required quality Is subject to constraints, such as time, cost and performance, so this requires prioritizing multiple goals. The project
... Show MoreThe purpose of this paper is to identifying the relationship between the moral climate and the decision-making of boxing referees from the standpoint of the coaches, and the research problem lies through the work of the researchers in training and managing the teams. It was noted that the role of the referees is one of the most important roles played by the workers to achieve the objectives of the federation, and that the moral climate that prevails among the administrative body the union and the referees on the one hand and between the referees and coaches on the other hand are among the factors of the success of everyone’s work and the survival and strengthening of confidence in their work and thus the continuity of success and
... Show MoreThe research aims to improve operational performance through the application of the Holonic Manufacturing System (HMS) in the rubber products factory in Najaf. The problem was diagnosed with the weakness of the manufacturing system in the factory to meet customers' demands on time within the available resources of machines and workers, which led to time delays of Processing and delivery, increased costs, and reduced flexibility in the factory, A case study methodology used to identify the reality of the manufacturing system and the actual operational performance in the factory. The simulation was used to represent the proposed (HMS) by using (Excel 2010) based on the actual data and calculate the operational performance measures
... Show MoreIn this paper all possible regressions procedure as well as stepwise regression procedure were applied to select the best regression equation that explain the effect of human capital represented by different levels of human cadres on the productivity of the processing industries sector in Iraq by employing the data of a time series consisting of 21 years period. The statistical program SPSS was used to perform the required calculations.