Exploring and Modeling Critical Success Factors of Value Management in Small Construction Projects
...Show More Authors

Scopus Crossref
View Publication
Publication Date
Sat Jan 19 2019
Journal Name
Iraqi Journal Of Agricultural Sciences
EVALUATION MANAGEMENT BROILER PRODUCTION PROJECTS AT BAGHDAD PROVINCE USING MANAGEMENT CRITERIA
...Show More Authors

This research aims were to evaluate management of broiler production projects in Baghdad province via using the criteria of management, included production index and economic figure (PI and EF) that specified to those projects. in addition to criteria of economic efficiency also applied (INME) index number of management efficiency, in order to the research requirements, data were obtained based on a questionnaire prepared for this purpose, which was collected by personal interview of (60) projects of the broiler production projects from (516) projects representing 11.6% of the research community in Baghdad province  in 2016. The results show that mean of PI and EF was (338). The increase in these two criteria is generally due to co

... Show More
View Publication
Crossref
Publication Date
Tue Jul 12 2022
Journal Name
Proceedings Of Seventh International Congress On Information And Communication Technology
Identification of Key Criteria of Selecting the Delivery System and Type of Contract in Construction Projects
...Show More Authors

View Publication
Scopus (2)
Crossref (2)
Scopus Clarivate Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of The Mechanical Behavior Of Materials
Time and finance optimization model for multiple construction projects using genetic algorithm
...Show More Authors
Abstract<p>Construction contractors usually undertake multiple construction projects simultaneously. Such a situation involves sharing different types of resources, including monetary, equipment, and manpower, which may become a major challenge in many cases. In this study, the financial aspects of working on multiple projects at a time are addressed and investigated. The study considers dealing with financial shortages by proposing a multi-project scheduling optimization model for profit maximization, while minimizing the total project duration. Optimization genetic algorithm and finance-based scheduling are used to produce feasible schedules that balance the finance of activities at any time w</p> ... Show More
View Publication
Scopus (4)
Crossref (4)
Scopus Clarivate Crossref
Publication Date
Tue Dec 01 2015
Journal Name
Journal Of Engineering
Valuation the Impact of Risks on the Goals and the Safety of Construction Projects in Iraq
...Show More Authors

Construction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.

The research aims first to the effective planning for analysis and risk managemen

... Show More
View Publication Preview PDF
Publication Date
Mon Feb 01 2021
Journal Name
Journal Of Engineering
Assessment of the Cost and Time Impact of Variation Orders on Construction Projects in Sulaimani Governorate
...Show More Authors

Variation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine w

... Show More
View Publication Preview PDF
Crossref (9)
Crossref
Publication Date
Wed Nov 17 2021
Journal Name
International Journal Of Knowledge Management
Assessing the Success of the Perceived Usefulness for Knowledge Management Systems
...Show More Authors

Recently, Knowledge Management Systems (KMS) consider one of the major fields of study in educational institutions, caused by the necessity to identify their knowledge value and success. Hence, based on the updated DeLone and McLean’s Information Systems Success Model (DMISSM), this study set out to assess the success of the Perceived Usefulness of Knowledge Management Systems (PUKMS) in Iraqi universities. To achieve this objective, the quantitative method is selected as the research design. In total, 421 university administration staff members from 13 Iraqi private universities were conducted. This study highlights a number of significant results depending on structural equation modeling which confirms that system, information, and s

... Show More
View Publication
Scopus (6)
Crossref (5)
Scopus Clarivate Crossref
Publication Date
Sat Oct 29 2022
Journal Name
Current Trends In Geotechnical Engineering And Construction
Identify the Critical Risk Factors at the Tendering Phase in Iraq
...Show More Authors

Risk factors can be considered unique in construction projects, especially in tendering phase. This research is directed to recognize and evaluate the importance of critical risk factors in the tendering phase related to Iraq’s construction project. As a rule, construction projects are impacted by risk factors throughout the project life cycle; without identifying and allocating these risk factors, the project cannot succeed. In this paper, the open and closed questionnaires are used to categorize the critical risk factors in tendering phase. Research aims to recognize the factors that influence the success of tendering phase, to determine the correct response to the risk’s factors in this research article, (IBM, SPSS, V23) package has

... Show More
View Publication Preview PDF
Scopus Crossref
Publication Date
Sat Oct 29 2022
Journal Name
Current Trends In Geotechnical Engineering And Construction
Identify the Critical Risk Factors at the Tendering Phase in Iraq
...Show More Authors

Risk factors can be considered unique in construction projects, especially in tendering phase. This research is directed to recognize and evaluate the importance of critical risk factors in the tendering phase related to Iraq’s construction project. As a rule, construction projects are impacted by risk factors throughout the project life cycle; without identifying and allocating these risk factors, the project cannot succeed. In this paper, the open and closed questionnaires are used to categorize the critical risk factors in tendering phase. Research aims to recognize the factors that influence the success of tendering phase, to determine the correct response to the risk’s factors in this research article, (IBM, SPSS, V23) package has

... Show More
View Publication
Scopus Crossref
Publication Date
Sun Jan 01 2023
Journal Name
E3s Web Of Conferences
Comparing the Design Alternatives Using Building Information Model (BIM) and Constructability in Iraqi Construction Projects
...Show More Authors

The Iraqi construction industry suffers from many issues that lead to many design errors, clashes, delays and cost overruns. Therefore, applying constructability will prevent these issues from happening, as it has proven its positive effect in different projects around the world. The goal of this paper is to use building information modelling (BIM) to assess the constructability, provide the opportunities for the project stakeholders to choose the best constructable design alternative and find the affection of applying constructability on project cost. The practical side of this research consists of two parts: in the first part, 37 factors are collected from the literature review as factors that effect on constructability. After tha

... Show More
View Publication
Scopus Crossref
Publication Date
Mon Apr 05 2021
Journal Name
Solid State Technology
Genetic Algorithms in Construction Project Management: A Review
...Show More Authors

Genetic algorithms (GA) are a helpful instrument for planning and controlling the activities of a project. It is based on the technique of survival of the fittest and natural selection. GA has been used in different sectors of construction and building however that is rarely documented. This research aimed to examine the utilisation of genetic algorithms in construction project management. For this purpose, the research focused on the benefits and challenges of genetic algorithms, and the extent to which genetic algorithms is utilised in construction project management. Results showed that GA provides an ability of generating near optimal solutions which can be adopted to reduce complexity in project management and resolve difficult problem