Exploring and Modeling Critical Success Factors of Value Management in Small Construction Projects
...Show More Authors

Scopus Crossref
View Publication
Publication Date
Fri Apr 22 2022
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
Developing models to predicting the effect of crises on construction projects using MLR technique
...Show More Authors

View Publication
Scopus (1)
Crossref (1)
Scopus Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects
...Show More Authors

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tender phase of

... Show More
Preview PDF
Crossref (4)
Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects
...Show More Authors

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tend

... Show More
View Publication Preview PDF
Crossref (4)
Crossref
Publication Date
Fri Jun 30 2023
Journal Name
Journal Of The College Of Education For Women
The Construction of the Iraqi Child in the UNICEF Reports during Covid19 Pandemic: A Critical Discourse Analysis
...Show More Authors

The present paper aims at investigating the linguistic image portrayed by UNICEF reports on the Iraqi child from a critical discourse analysis perspective during Covid19 pandemic (2020). The paper attempts to fill a gap in research literature concerning the linguistic construction of the Iraqi child by the UNICEF reports during the critical health crisis of Covid19. Van  Leeuwen’s (2008) approach of social actor representation has been adopted for this purpose. From Van  Leeuwen’s approach, the category of determination (single determination and overdetermination) has been selected to be the main analytical tool for its high compatibility with the set of objectives put forward to figure out how such a globally effective and

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Apr 08 2018
Journal Name
Al-khwarizmi Engineering Journal
Building a Management System to Control the Construction Claims in Iraq
...Show More Authors

The paper deals with claims in construction projects in Iraq and studies their types, causes, impacts, resolution methods and then proposes a management system to control the impacts of claims. Two parts have been done to achieve the research objective (theoretical part and practical part). The findings showed that the main types of the claims are extra work claims, different site condition claims, delay claims and the main causes of the claims are variation of the orders, design errors and omission, delay in payments by owner, variation in quantities and scheduling errors. The claims have bad impacts on the cost by increasing (10% to 25%) and also on the duration of the project by increasing from (25% to 50%).The negotiation is the main

... Show More
View Publication Preview PDF
Crossref (5)
Crossref
Publication Date
Sun Jan 08 2023
Journal Name
Journal Of Planner And Development
Statistical Evaluation of the Planning Process and Scheduling Management for Irrigation and Drainage Projects in the Republic of Iraq
...Show More Authors

The Research aims to investigate into reality in terms of planning and scheduling management process for sake the implementation and maintenance of irrigation and drainage projects in the Republic of Iraq, with an indication of the most important obstacles that impede the planning and scheduling management process for these projects and ways of addressing them and minimizing their effects.                                                  For the purpose of achieving the goal of the research, a sci

... Show More
View Publication Preview PDF
Publication Date
Mon Aug 04 2025
Journal Name
Al-rafidain Journal Of Medical Sciences ( Issn 2789-3219 )
Exploring the Current Situation of Cancer Patients’ Management from Physicians’ Perspective: A qualitative Study
...Show More Authors

Background: Cancer is rising as a significant global public health concern. The global cancer burden is escalating, exerting considerable physical, emotional, and financial strain on people, families, communities, and healthcare systems. Objective: To explore the challenges faced in cancer management from the perspectives of physicians. Methods: A qualitative study was conducted between November 2024 and February 2025. Physicians were recruited from three different centers in Baghdad and Karbala using purposive and snowball sampling. The data collection was concluded upon reaching a saturation point. Results: This study included twenty-six oncologists. There was about parity between the two genders, with a slight male predominance.

... Show More
View Publication Preview PDF
Scopus Crossref
Publication Date
Sat Jan 19 2019
Journal Name
Iraqi Journal Of Agricultural Sciences
USING PROBABILITY REGRESSION MODELS TO MEASURING MANAGEMENT EFFICIENCY FOR BROILER PROJECTS
...Show More Authors

The efficiency of management is determining factor for the success or failure of agricultural projects generally and Livestock particularly achieving its objectives. Therefore, this research came to diagnose the most important variables that determine the efficiency of management using the probability regression models to measure the probability of management efficient of broilers production projects using  random sample included (60) broilers projects represented 11.6% of Baghdad province (research community) in 2016. After estimating the relationship between the management efficiency (descriptive dependent variable) and the independent variables affecting it (age, educational level, production index (PI), experience). The results

... Show More
View Publication
Crossref (1)
Crossref
Publication Date
Thu Feb 05 2026
Journal Name
Plos Global Public Health
Exploring stakeholder perceptions of peer support initiatives in the management of diabetes in low- and middle-income countries: An online survey study
...Show More Authors

Peer support is an effective strategy to promote self-management behaviors and improve well-being in those with cardiometabolic disease, including type 2 diabetes mellitus (T2DM). There is limited knowledge about stakeholder perceptions regarding peer support programs in low- and middle-income countries (LMICs). The study assessed stakeholders’ awareness and understanding of peer support initiatives for T2DM, and explored their perceived barriers and readiness for implementation. A cross-sectional, self-administered online survey with branching logic was distributed to stakeholders across macro- (health policy), meso (tertiary hospital), and micro (community) levels of LMIC healthcare systems from June 1 to December 15, 2023. Quan

... Show More
View Publication
Scopus Crossref
Publication Date
Fri Jul 21 2023
Journal Name
Journal Of Engineering
Development of an Integrated Construction Management System for Building Estimation
...Show More Authors

Project management are still depending on manual exchange of information based on paper documents. Where design drawings drafting by computer-aided design (CAD), but the data needed by project management software can not be extracted directly from CAD, and must be manually entered by the user. The process of calculation and collection of information from drawings and enter in the project management software needs effort and time with the possibility of errors in the transfer and enter of information. This research presents an integrated computer system for building projects where the extraction and import quantities, through the interpretation of AutoCAD drawing with MS Access database of unit costs and productivities for the pricing and

... Show More
View Publication Preview PDF