Many risks have adverse consequences for construction projects’ objectives such as quality, schedule, and cost. As engineering procurement construction (EPC) contracts gradually become one of the most common types used in implementing major large-scale construction projects, identifying common risk types and analyzing their root causes is important for developing measures to decrease and eliminate future risks in these types of contracts. The information about the main causes of risks was collected
Abstract
This study was to demonstrate the role-use planning scientific methods is disabled and little used in the planning and follow-up construction of vital projects in the province of Baghdad, including network planning methods, in order to find the optimal time to finish the project in light of the resources available and the budget set for it, in the current research has been used the most prominent network planning methods and two stylistic (CPM / PERT), was the application of the critical path method on standard-design school project (traditional) to draw Action Network according to confirmed times for the activities of the project and account his Crashing time , It was Pert technique applied to the project hemato
... Show MoreThis study dealt with the management strategy as an independent variable and the integrated industrial distribution as a variable. The study aimed at finding the integrated industrial distribution that fits with the management strategy in providing the needs of the firm on the one hand and reducing the cost of management that is reflected in increasing its profits.
The researcher selected the data from (130) decision makers in the corporation and used the questionnaire as a tool for collecting data and used a set of statistical tools and tools suitable for the nature of information and were processed using the data analysis system (SPSS version 24) Based on the analysis of the responses of the sample and the test of correlation and
That the building of the national economy depends on the extent of the possibility of transition from the rent economy seeking to increase GDP (GDP1), and the tendency to manage projects with external sources of funding, or allow projects with foreign capital is a necessity. The strategic challenges faced by the economy in countries that have experience in investment projects have faced several factors internal and external for a period of time and not a few and the pressures and difficulties and failures have affected in one way or another on the development work in that country. On this basis, the stakeholders have a role to pay attention to the issue of the feasibility of the pattern of foreign investment in the investment environment
... Show MoreThe research aims to identify the risks faced by projects and work on the administration, such as those risks by using professional Project Management System (Project Management Professional) by identifying those risks and their impact on the objectives of the project, if they occur and to provide appropriate responses to Ha.autam search application on the draft Law Faculty port by the General Mansour Construction Contracting company has been using a method personal interview with the heads of departments and project managers in the Al-Mansour and tools descriptive and quantitative analysis as was used (likelihood and impact of risk analysis, Ai_kaoa scheme Sbb- effect, analysis of probability and impact, risk matrix (probability
... Show MoreThe research endeavors to harness the benefits stemming from the integration of constraint theory into construction project management, with the primary goal of mitigating project completion delays. Additionally, it employs fuzzy analysis to determine the relative significance of fundamental constraints within projects by assigning them appropriate weights. The research problem primarily revolves around two key issues. Firstly, the persistent utilization of outdated methodologies and a heavy reliance on workforce experience without embracing modern computerized technologies. Secondly, the recurring problem of project delivery delays. Construction projects typically encompass five fundamental constraint types: cost restrictions, tim
... Show MoreThe concept of insurance policy is one of the concepts that expresses a way to face the risks that a person is exposed to in the field of his life. It is a system that involves a prior agreement between two parties through which the risk is transferred from the second party (the insured) to the first party (the insurer) in return for paying an amount Calculated was able to cover the potential loss according to certain percentages agreed upon between the two parties, and that the main goal of any scientific analysis of the risk is to choose the most appropriate policy or method to confront it, by identifying the risks and ways to address them, and the main goal is to reduce losses and limit the possibility of their occurrence.
In
... Show More
The research aims to study and analysis of concurrent engineering (CE) and cost optimization (CO), and the use of concurrent engineering inputs to outputs to improve the cost, and the statement of the role of concurrent engineering in improving the quality of the product, and achieve savings in the design and manufacturing time and assembly and reduce costs, as well as employing some models to determine how much the savings in time, including the model (Lexmark) model (Pert) to determine the savings in design time for manufacturing and assembly time.
To achieve the search objectives, the General Company for Electrical and Electronic Industries \ Refrigerated Engine
... Show MoreEach project management system aims to complete the project within its identified objectives: budget, time, and quality. It is achieving the project within the defined deadline that required careful scheduling, that be attained early. Due to the nature of unique repetitive construction projects, time contingency and project uncertainty are necessary for accurate scheduling. It should be integrated and flexible to accommodate the changes without adversely affecting the construction project’s total completion time. Repetitive planning and scheduling methods are more effective and essential. However, they need continuous development because of the evolution of execution methods, essent
The subject of fear is one of the most important tasks that one should seek to find out the reasons behind it, and push it up with all its sound mental concepts.
The main reason for the lack of security and fear and disturbance in the world is to commit the legitimate violations that God warned us in his Holy Book as well as in the Sunnah of His Prophet (peace be upon him).
The talk about the causes of fear in the Koran is not limited to the word (fear) Fakk but came in different and varied methods such as (horror) and (awe) and (shares) and (narrow).