Many risks have adverse consequences for construction projects’ objectives such as quality, schedule, and cost. As engineering procurement construction (EPC) contracts gradually become one of the most common types used in implementing major large-scale construction projects, identifying common risk types and analyzing their root causes is important for developing measures to decrease and eliminate future risks in these types of contracts. The information about the main causes of risks was collected
Construction of photographed bullying scale of kindergarteners was the aim of this study. The study conducted to answer the raised question, could the bullying among kindergarteners be measured?. A total of (200) boy and girl were selected from city of Baghdad to be the sample of the study. The scale composed of (27) item with colored pictures. It takes about (15) minuets to answer the whole scale items. SPSS tools were used to process the collected data. The result showed that the bullying among kindergarteners could be measured.
Capparis spinosa is one of the oldest genera grown in Iraqi land with worldwide traditional medicinal uses beside the culinary uses. These uses were own to the presence of many phytochemical including flavonoids, polyphenols. Among the reported polyphenolic acids are caffeic, chlorogenic and ferulic acids with well-known powerful antioxidant properties. The present work aimed to identify the presence of these polyphenolic acids in Iraqi caper naturally gown in the rural area of middle Iraq following standard chromatographic procedures. Aerial parts of the plant (buds, berries and leaves) were extracted with hydroalcoholic solvent by maceration method. Thin layer chromatographic techniques and HPLC analysis were performed to iden
... Show MoreThe research Aim is to provide support to small enterprises by providing tools that enable measurement and test their performance and identifying weaknesses and work on them is determined by the problem of searching using traditional assessment methods for small projects with only financial performance measurement standards that do not provide a complete picture of the performance of these projects so use the balanced scorecard the four pillars (financial, customer, learning and growth, and internal processes) and identify deviations and work on them through the use of the outputs of the programme (probe), PROmoting Business Excellence-PROBE), which It is a model of performance evaluation, with which you can deve
... Show More