Safety management in private construction project in Iraq
...Show More Authors

Scopus Crossref
View Publication
Publication Date
Mon Mar 01 2021
Journal Name
Journal Of Management In Engineering
Identifying Pertinent Indicators for Assessing and Fostering Diversity, Equity, and Inclusion of the Construction Workforce
...Show More Authors

View Publication
Scopus (76)
Crossref (73)
Scopus Clarivate Crossref
Publication Date
Mon Jun 01 2015
Journal Name
Conference: 8th International Conference And Exhibition On Design And Production Of Machines And Dies/molds
Design, Construction, and Controlling of A Shaped Metal Deposition Machine Using Arc Metal-Wire System
...Show More Authors

Publication Date
Tue Jan 01 2013
Journal Name
Ibn Al-haitham Journal For Pure And Applied Science
Classification and Construction of (k,3)-Arcs on Projective Plane Over Galois Field GF(7)
...Show More Authors

The purpose of this work is to study the classification and construction of (k,3)-arcs in the projective plane PG(2,7). We found that there are two (5,3)-arcs, four (6,3)-arcs, six (7,3)arcs, six (8,3)-arcs, seven (9,3)-arcs, six (10,3)-arcs and six (11,3)-arcs. All of these arcs are incomplete. The number of distinct (12,3)-arcs are six, two of them are complete. There are four distinct (13,3)-arcs, two of them are complete and one (14,3)-arc which is incomplete. There exists one complete (15,3)-arc.

Publication Date
Mon Jan 01 2018
Journal Name
International Journal Of Science And Research (ijsr)
Optimal Economic Design of Diversion Structures during Construction of a Dam by Particle Swarm Optimization
...Show More Authors

Diverting river flow during construction of a main dam involves the construction of cofferdams, and tunnels, channels or other temporary passages. Diversion channels are commonly used in wide valleys where the high flow makes tunnels or culverts uneconomic. The diversion works must form part of the overall project design since it will have a major impact on its cost, as well as on the design, construction program and overall cost of the permanent works. Construction costs contain of excavation, lining of the channel, and construction of upstream and downstream cofferdams. The optimization model was applied to obtain optimalchannel cross section, height of upstream cofferdam, and height of downstream cofferdamwith minimum construction cost

... Show More
Publication Date
Sun Jun 05 2011
Journal Name
Baghdad Science Journal
Design and Construction of a Testing Platform and Estimating Attenuation Painting Reflectivity to Laser Beam
...Show More Authors

The project has been described the design and construction of a reliable optical testing platform used for evaluate the reflectivity of metal surfaces treated with special paintings required for laser beam attenuation. The platform comprises an Nd-YAG laser system which has been designed and fabricated with specifications to be compatible with their corresponding in laser range finder transmitters used for various applications. The reflectivity of various attenuating paintings, at different detection angles, has been observed. Moreover, the variation of the reflected energy with painting type and metal type to be painted has been studied experimentally. Results illustrated the existence of a definite angle, at which the reflectivity was max

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Dec 01 2009
Journal Name
Iraqi Journal Of Physics
Construction of Anisotype CdS/Si Heterojunction and Lineup Using I-V and C-V Measurements
...Show More Authors

Near-ideal p-CdS/n-Si heterojunction band edge lineup has been investigated for the first time with aid of I-V and C-V measurements. The heterojunction was manufactured by deposition of CdS films prepared by chemical spray pyrolysis technique (CSP) on monocrystalline n-type silicon. The experimental data of the conduction band offset Ec and valence band offset Ec were compared with theoretical values. The band offset Ec=530meV and Ev=770meV obtained at 300K. The energy band diagram of p-CdS/n-Si HJ was constructed. C-V measurements depict that the junction was an abrupt type and the built-in voltage was determined from C-2-V plot

View Publication Preview PDF
Publication Date
Thu Dec 01 2011
Journal Name
Journal Of Engineering
DESIGN, CONSTRUCTION AND TESTING OF LOW SPEED WIND TUNNEL WITH ITS MEASUREMENT AND INSPECTION DEVICES
...Show More Authors

A low speed open circuit wind tunnel has been designed, manufactured and constructed at the
Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of
the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the
first part of the work; that is the design calculations, simulation and construction. It will be followed by a
second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test
section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70
m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow
distu

... Show More
View Publication Preview PDF
Crossref (7)
Crossref
Publication Date
Wed Mar 30 2022
Journal Name
Journal Of Economics And Administrative Sciences
The Role Of Smart Leadership Dimensions In Crisis Management- A study For Opinions Of Sample Of Administrative Leaderships In A number Of Humanities Colleges At The University Of Mosul
...Show More Authors

This research aims at answering many questions raised by the research problem concerning the view of the organizations under consideration for the concept of smart leadership and its most important dimensions, as well as the view of crisis management and its concept and most important methods through research objectives that define and clarify the smart leadership with its dimensions and methods of crisis management.

For the purpose of reaching the results of the research and testing the assumptions about the relationship between smart leadership and methods of crisis management, the researcher adopted a questionnaire, designed especially to be a criterion for the research, as the main tool for data coll

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Tue Dec 22 2020
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Continuous improvement of technology and its role In reducing the costs in accordance with the management style On the basis of the activities (ABM): Applied Research in the General Company for Textile Industries / hula
...Show More Authors

The administration on the basis of the activities designed to evaluate the performance of activities in terms of cost, time and quality by identifying activities that add value and those that are no add value and  enables the administration of making up their own continuous improvement in production, through lower costs and reduce the time and improve the quality   and reduce the incidence of spoilage and waste, y based search Ally premise that (the continuous improvement of the adoption of management style on the basis of the activities helps management in decision-making wise to reduce  costs) to prove the hypothesis has sought research to achieve its goal of  Alkadivh and Alkoppelan     &nb

... Show More
View Publication Preview PDF
Publication Date
Tue Dec 15 2020
Journal Name
Aip Conference Proceedings
The water bodies in the Southern East of Iraq before and after 2018
...Show More Authors

This study is concerned with the recent changes that occurred in the last three years (2017-2019) in the marshes region in southern Iraq as a result of the changes in the global climate, the study included all the water bodies in the five governorates that are located in the southern regions of Iraq (Wasit, Maysan, Dhi-Qar, Qadisiyah and Basrah), which represent the marshes lands in Iraq. Scenes of the Landsat 8 satellite are used to create a mosaic to cover the five governorates within a time window with the slightest difference between the date of the scene capture, not to exceed 8 days. The results of calculating the changes in water areas were obtained using the classifier support vector machine, where high accuracy ratios were recorded

... Show More
View Publication Preview PDF
Scopus (3)
Crossref (3)
Scopus Clarivate Crossref