Objectives: To assess levels of premenstrual psychological disorders of the students in Bab Al-Mua’dham Complex and to find out the relationship between the levels of premenstrual psychological and physical disorders and some demographic characteristics of the students. Methodology: A descriptive study was accomplished throughout the period from the 1st of October, 2015 to the 8th of July, 2016 to assess the psychological and physical problems. A purposive sample of 313 students distributed among different colleges of Bab Al-Mua’dam complex distributed as following: 82 students are from college of Arts; 79
Objectives: To assess levels of premenstrual psychological disorders of the students in Bab Al-Mua’dham Complex and to find out the relationship between the levels of premenstrual psychological and physical disorders and some demographic characteristics of the students. Methodology: A descriptive study was accomplished throughout the period from the 1st of October, 2015 to the 8th of July, 2016 to assess the psychological and physical problems. A purposive sample of 313 students distributed among different colleges of Bab Al-Mua’dam complex distributed as following: 82 students are from college of Arts; 79 students are from College of Languages; 48 students are from college of Islamic Sciences: and 104 are from College of Nursing. For t
... Show MoreThe problem of multi assembly line balancing appears as one of the most prominent and complex type of problem. The research problem of this dissertation is concerned with choosing the suitable method that includes the nature of the processes of the multi assembly type of the sewing line at factory no. (7). The State Company for Leather Manufacturing. The sewing line currently suffers from idle times at work stations which resulted in low production levels that do not meet the production plans. The authors have devised a flexible simulation model which uses the uniform distribution to generate task time for each shoe type produced by the factory. The simulation of the multi assembly line was based on assigni
... Show MoreThe aim of this study was to Identifying The Effect of using Linear programming and Branching programming by computer in Learning and Retention of movement concatenation(Linkwork) in parallel bars in Artistic Gymnastics. The searchers have used the experimental method. The search subject of this article has been taken (30) male - students in the second class from the College of Physical Education/University of Baghdad divided into three groups; the first group applied linear programming by computer, and the second group has been applicated branching programming by computer, while precision group used traditional method in the college. The researchers concluded the results by using the statistical bag for social sciences (spss) such as both
... Show MoreIn this work chemical vapor deposition method (CVD) for the production of carbon nanotubes (CNTs) have been improved by the addition of S. Steel mesh container (SSMC) inside which the catalyst (Fe/Al2O3) was placed. Scanning electron microscopy (SEM) investigation method used to study nanotubes produced, showed that high yield of two types of (CNTs) obtained, single wall carbon nanotube (SWCNTs) with diameter and length of less than 50nm and several micrometers respectively and nanocoil tubes with a diameter and length of less than 100nm and several micrometers respectively. The chemical analysis of (CNTs) reveals that the main component is carbon (94%) and a little amount of Al (0.32%), Fe (2.22%) the reminder is oxygen. It was also fou
... Show MoreIn this paper, the reliability and scheduling of maintenance of some medical devices were estimated by one variable, the time variable (failure times) on the assumption that the time variable for all devices has the same distribution as (Weibull distribution.
The method of estimating the distribution parameters for each device was the OLS method.
The main objective of this research is to determine the optimal time for preventive maintenance of medical devices. Two methods were adopted to estimate the optimal time of preventive maintenance. The first method depends on the maintenance schedule by relying on information on the cost of maintenance and the cost of stopping work and acc
... Show More