Infrastructure projects take a long time, are complex, multidisciplinary, use different materials and products, and have high risk. These characteristics affect the process of supplying materials. The current paper studies the ability to improve the supply chain process and decrease its cost by identifying the factors that affect it. These factors are used as variables in the mathematical model, which is working under uncertain conditions when the consumption rate of materials is not constant. The information used in this model is obtained from Building Information Modeling (BIM) and Geographical Information System (GIS) techniques and the genetic algorithm is utilized to determine the optimal supplier and the quantities of supplies for different materials. The case study used in this research is a concrete bridge. The obtained results show that the cost can decrease by about 28.2% by changing the supplier and the quantity of supplies.
Construction projects need methods and techniques to ensure the level of quality and commensurate with the level required and documented in the project contract. The quality of the project is affected by the quality of the inputs and accompanying procedures in the construction of the project.
Al-Rumaitha residential project found that the quality of the concrete for the ceilings in the research sample (the roof of the third floor of buildings A25 and A26) and (roof of the second floor of buildings A27, A28, A29, A30, A31, A32 and A33) and roof of buildings A15 and A16 A19)) is not the required quality level.
The idea of the research came after the need to improve the performance o
... Show MoreIn this work, the occurrence conditions of both local Bifurcation and persistence were studied, Saddle-node bifurcation appears near fourth point, near the first point, the second point and the third point a transcritical bifurcation occurred but no pitchfork bifurcation happened near any of the four equilibrium points. In addition to study conditions for Hopf-bifurcation near positive stable point that is the fourth point. Besides discuss persistence occurrence as globally property of the food chain of three species include prey, first predator and top predator with impact of toxin in all species and harvesting effect on the predator’s only. Numerical results for the set of hypothe
In this reserch Some new substituted and unsubstituted poly imides compounds. were synthesized by reaction of acrylol chloride with different amides (aliphatic and aromatic) in a suitable solvent in the presence amount triethyl amine (Et3N) with heating. The Structure confirmation of all polymers were confirmed using FT-IR,1H-NMR,13C-NMR and UV spectroscopy. Thermal analysis (TG) for some polymers showed their thermal stabilities. Other physical properties including softening points, melting point and solubility of the polymers were also measured
Huge yearly investments were made by organizations for the development and maintenance. However, it has been reported that most of the IT projects fails as it is delayed, over budget and discontinued quality. A systematic literature review (SLR) was conducted to identify the critical success factors (CSFs) for the IT projects. Nine (9) CSFs was identified from the SLR. An online survey was conducted among 103 respondents from developers and IT managers. The data was analyzed using the Statistical Package for Social Science (SPSS 22). The findings showed that the highest CSFs of IT projects is commitment and motivation. Project monitoring was found the lowest score ranked by respondents.
To track scientific developments and achievements, for example, that (achieved) after the Second World War until this moment, make each of us in absolute amazement. He invented the computer, discovered the genetic factor (DNA), and discovered the drawing of the human genetic map, going up to the moon, penetrating outer space by satellites, getting close to distant planets, producing jet planes, microprocessors, and lasers, in addition to enabling a person to create a layer of The material is extremely thin and extremely imaginative. It has also become possible for a person to "dig lines that do not exceed 20 billion meters of thickness." The human being was also able to collect things an atom and build an efficient and high-precision con
... Show MoreThe strategies of knowledge management have became the basis in the promotion of core competencies. Therefore gained an increasing prominence. This led the administrations of organizations to work to effectiveness of there strategies, which results to build there core competences through teamwork, empowerment and personal effectiveness of employees. From this arises research problem about the organizations leaders recognize extent of knowledge management strategies which that lead to core competence. In addition the research tray definition the relation and nature of affect between its variables. The research was carried on sample (72) managers from board of supreme audit in Iraq and used statistical tools and methods.
... Show MoreThe new multidentate Schiff-base (E)-6,6′-((1E,1′E)-(ethane-1,2-diylbis(azan-1-yl-1-ylidene))bis(methan-1-yl-ylidene))bis(4-methyl-2-((E)(pyridine-2-ylmethylimino)methyl)phenol) H2L and its polymeric binuclear metal complexes with Cr(III), Mn(II), Fe(II), Co(II), Ni(II), Cu(II), Zn(II), Cd(II) and Hg(II) are reported. The reaction of 2,6-diformyl-4-methyl-phenol with ethylenediamine in mole ratios of 2:1 gave the precursor 3,3′-(1E,1′E)-(ethane-1,2-diylbis(azan-1-yl-1ylidene))bis(methan-1-yl-1-ylidene)bis(2-hydroxy-5-methylbenzaldehyde) W. Condensation of the precursor with 2-(amino-methyl)pyridine in mole ratios of 1:2 gave the new N6O2 multidentate Schiff-base ligand H2L. Upon complex formation, the ligand behaves as a dibasic oct
... Show MoreConstruction projects are complicated in nature and require many considerations in contractor selection. One of the complicated interactions is that between performance with the project size, and contractor financial status, and size of projects contracted. At the prequalification stage, the financial requirements restrict the contractors to meet minimum limits in financial criteria such as net worth, working capital and annual turnover, etc. In construction projects, however, there are cases when contractors meet these requirements but show low performance in practice. The model used in the study predicts the performance by training of a neural network. The data used in the study are 72 of the most recent roadw
... Show MoreIn this research, Fuzzy Analytic Hierarchy Process technique is applied (Fuzzy AHP) which is one of multi-criteria decision making techniques to evaluate the criteria for urban planning projects, the project of developing master plan of Al-Muqdadiyah city to 2035 has been chosen as a case study. The researcher prepared a list of criteria in addition to the authorized departments criteria and previous researches in order to choose optimized master plan according to these criteria. This research aims at employing the foundations of (Fuzzy AHP) technique in evaluating urban planning criteria precisely and flexible. The results of the data analysis to the individuals of the sample who are specialists, in this aspect. The la
... Show MoreIn a resource-limited world, there is an urgent need to develop new economic models, from the traditional unsustainable industrial model of product consumption and disposal, to a new model based on the concepts of sustainability in its comprehensive sense, the so-called circular economy, using fewer resources in manufacturing processes and changing practices in product disposal to waste, by removing its use, recycling and manufacturing to start another manufacturing process. In an era of intense competition in domestic and global markets, the importance of the circular economy is highlighted in its ability to strengthen the competitiveness of enterprises in those markets, by reducing the cost and increasing the quality of the pro
... Show More