This paper presents a three-dimensional Dynamic analysis of a rockfill dam with different foundation depths by considering the dam connection with both the reservoir bed and water. ANSYS was used to develop the three-dimensional Finite Element (FE) model of the rockfill dam. The essential objective of this study is the discussion of the effects of different foundation depths on the Dynamic behaviour of an embanked dam. Four foundation depths were investigated. They are the dam without foundation (fixed base), and three different depths of the foundation. Taking into consideration the changing of upstream water level, the empty, minimum, and maximum water levels, the results of the three-dimensional FE modelling of the rockfill dam show that adding the water effect decreases the natural frequencies of the system, but not more than 45%. While, with the increase of the reservoir water level of the dam from minimum to maximum, the natural frequencies of the dam decreased, but not more than 13% in the case of maximum water level changes. The results show that the influence of changing the upstream water level affects the horizontal displacement of the dam more than the vertical displacement.
The researcher concluded that it consists of several types of structures, where the intellectual structure related to the choice of the idea, its treatment, its effect, the choice of the topic, the way ideas are addressed and presented in the film, and then the dramatic structure of the film's characters, the formulation of its events, its dramatic composition, its temporal arrangement, the identification of the parties to the conflict and their management, then these are formulated. Visions and ideas through the visual and audio signal systems, which work to highlight the stylistic features in the character of the film director.
This study is conducted in order to, investigate the trophic state of Duhok Lake Dam located within Duhok city, Iraq. Water samples are collected seasonally from three monitored sites during 2011. The parameters used for assessing water quality and trophic status level include: water temperature, pH, EC, TDS, DO, BOD5, nutrients, Secchi disk transparency, and chlorophyll a. The results reveal that DO is above 5 mg.l-1 in all sites, BOD5 value is within permissible level for domestic uses. Water quality considered as a hard type. High sulfate concentration is recorded during the study period. Trophic state shows that water type is classified as mesotrophic during autumn season, while it is regarded as eutrophic in other seasons. TDN/TDP rati
... Show MoreIn high-dimensional semiparametric regression, balancing accuracy and interpretability often requires combining dimension reduction with variable selection. This study intro- duces two novel methods for dimension reduction in additive partial linear models: (i) minimum average variance estimation (MAVE) combined with the adaptive least abso- lute shrinkage and selection operator (MAVE-ALASSO) and (ii) MAVE with smoothly clipped absolute deviation (MAVE-SCAD). These methods leverage the flexibility of MAVE for sufficient dimension reduction while incorporating adaptive penalties to en- sure sparse and interpretable models. The performance of both methods is evaluated through simulations using the mean squared error and variable selection cri
... Show MoreIn recent years the interest in fractured reservoirs has grown. The awareness has increased analysis of the role played by fractures in petroleum reservoir production and recovery. Since most Iraqi reservoirs are fractured carbonate rocks. Much effort was devoted to well modeling of fractured reservoirs and the impacts on production. However, turning that modeling into field development decisions goes through reservoir simulation. Therefore accurate modeling is required for more viable economic decision. Iraqi mature field being used as our case study. The key point for developing the mature field is approving the reservoir model that going to be used for future predictions. This can
Diverting river flow during construction of a main dam involves the construction of cofferdams, and tunnels, channels or other temporary passages. Diversion channels are commonly used in wide valleys where the high flow makes tunnels or culverts uneconomic. The diversion works must form part of the overall project design since it will have a major impact on its cost, as well as on the design, construction program and overall cost of the permanent works. Construction costs contain of excavation, lining of the channel, and construction of upstream and downstream cofferdams. The optimization model was applied to obtain optimalchannel cross section, height of upstream cofferdam, and height of downstream cofferdamwith minimum construction cost
... Show MoreBackground: The aim of the study was to evaluate the amount of changes in the horizontal and vertical maxillary arch dimensions measurements following the premature loss of primary molars. Materials and methods: The sample consist of (50) children with unilateral prematurely extracted either first or second primary molars at the mixed dentition stage. Results and Conclusions: Results shows that there was an increase in the vertical incisor to canine distance (A) with both premature loss of first & second primary molars due to distal movement of primary canines and at the same time there were a significant loss of space in the extraction space with premature loss of second primary molar due to a mesial movement of maxillary first permanent
... Show MoreThe annealing temperature (200–500 °C) effects of optical frequency response on the dielectric functions of sol–gel derived CuCoO